9925 Angora St
Dallas, TX 75218
9925 Angora St: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 9925 Angora St, Dallas, TX 75218. The most recent, filed November 25, 2020, covers: “Interior exterior remodel to sfd”.
Compiled from City of Dallas records · updated Nov 25, 2020
- Projects
- 2
- 2 filings
- Latest filing
- Nov 25, 2020
- since Nov 25, 2020
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 9925 Angora St
What is being built at 9925 Angora St?
The latest filing (City of Dallas permit 2011201009, November 25, 2020) covers interior exterior remodel to sfd.
How many permits and filings does 9925 Angora St have?
2 filings across 2 projects, from November 25, 2020 to November 25, 2020.
Is there other construction near 9925 Angora St?
Yes. Nearby filings include 9922 Angora St (remove existing roof and install new roof, Jan 21, 2021); 9907 Angora St (this project includes excavation, repiping, and backfilling over a projected 6day timeline. scope of work covers repiping all existing cast iron under the home with new schedule 40 pvc, including a new 2" ptrap and double cleanouts accessed via 5' of tunneling under the beam. a new sewer line will be installed from the foundation to the city tap. all work will be completed under a city of dallas permit and includes a 3year warranty on all underslab piping, Jun 30, 2025); 9915 Garland Rd (in wall plumbing and setting fixtures, Dec 8, 2025).
How do I get alerts for new permits at 9925 Angora St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75218- 9922 Angora StJan 21, 2021Remove existing roof and install new roof · 13 m away
- 9907 Angora StJun 30, 2025This project includes excavation, repiping, and backfilling over a projected 6day timeline. scope of work covers repiping all existing cast iron under the home with new schedule 40 pvc, including a new 2" ptrap and double cleanouts accessed via 5' of tunneling under the beam. a new sewer line will be installed from the foundation to the city tap. all work will be completed under a city of dallas permit and includes a 3year warranty on all underslab piping · 21 m away
- 9915 Garland RdDec 8, 2025In wall plumbing and setting fixtures · 83 m away
- 1206 N Selva DrAug 10, 20263 ton complete · 101 m away
- 1222 N Selva DrDec 3, 2020Replace or modify existing hvac · 102 m away
- 9909 Garland RdOct 13, 2020Repair to sewer main · 112 m away
- 1242 N Selva DrNov 3, 2025Replace hvac · 114 m away
- 1252 N Selva DrMar 16, 2026Gas line to pool heater and grill · 116 m away
- 9816 Angora StJun 16, 2025Move washer box new gas line to tankless · 126 m away
- 1215 S Selva DrJan 18, 2021Replace or modify existing hvac · 156 m away
- 1207 S Selva DrNov 20, 2020Interior remodel only · 159 m away
- 1237 S Selva DrJan 12, 2021Install roofing mountage solar panels · 163 m away