9907 Angora St
Dallas, TX 75218
9907 Angora St: 1 project on record
City of Dallas lists 1 filing across 1 project at 9907 Angora St, Dallas, TX 75218. The most recent, filed June 30, 2025, covers: “This project includes excavation, repiping, and backfilling over a projected 6day timeline. scope of work covers repiping all existing cast iron under the home with new schedule 40 pvc, including a new 2" ptrap and double cleanouts accessed via 5' of tunneling under the beam. a new sewer line will be installed from the foundation to the city tap. all work will be completed under a city of dallas permit and includes a 3year warranty on all underslab piping”.
Compiled from City of Dallas records · updated Jun 30, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 30, 2025
- since Jun 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectThis project includes excavation, repiping, and backfilling over a projected 6day timeline. scope of work covers repiping all existing cast iron under the home with new schedule 40 pvc, including a new 2" ptrap and double cleanouts accessed via 5' of tunneling under the beam. a new sewer line will be installed from the foundation to the city tap. all work will be completed under a city of dallas permit and includes a 3year warranty on all underslab piping
This project includes excavation, repiping, and backfilling over a projected 6day timeline. scope of work covers repiping all existing cast iron under the home with new schedule 40 pvc, including a new 2" ptrap and double cleanouts accessed via 5' of tunneling under the beam. a new sewer line will be installed from the foundation to the city tap. all work will be completed under a city of dallas permit and includes a 3year warranty on all underslab piping
City of Dallas permitResidential Plumbing Permit
Sources: City of Dallas
Questions about 9907 Angora St
What is being built at 9907 Angora St?
The latest filing (City of Dallas permit RES-PLM-25-001995, June 30, 2025) covers this project includes excavation, repiping, and backfilling over a projected 6day timeline. scope of work covers repiping all existing cast iron under the home with new schedule 40 pvc, including a new 2" ptrap and double cleanouts accessed via 5' of tunneling under the beam. a new sewer line will be installed from the foundation to the city tap. all work will be completed under a city of dallas permit and includes a 3year warranty on all underslab piping.
How many permits and filings does 9907 Angora St have?
1 filing across 1 project, from June 30, 2025 to June 30, 2025.
Is there other construction near 9907 Angora St?
Yes. Nearby filings include 9925 Angora St (permit to complete work started for permits (1808011089 & 1808011093), Nov 25, 2020); 9922 Angora St (remove existing roof and install new roof, Jan 21, 2021); 9915 Garland Rd (in wall plumbing and setting fixtures, Dec 8, 2025).
How do I get alerts for new permits at 9907 Angora St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75218- 9925 Angora StNov 25, 2020Permit to complete work started for permits (1808011089 & 1808011093) · 21 m away
- 9922 Angora StJan 21, 2021Remove existing roof and install new roof · 23 m away
- 9915 Garland RdDec 8, 2025In wall plumbing and setting fixtures · 78 m away
- 9909 Garland RdOct 13, 2020Repair to sewer main · 98 m away
- 9816 Angora StJun 16, 2025Move washer box new gas line to tankless · 105 m away
- 1206 N Selva DrAug 10, 20263 ton complete · 121 m away
- 1222 N Selva DrDec 3, 2020Replace or modify existing hvac · 122 m away
- 1252 N Selva DrMar 16, 2026Gas line to pool heater and grill · 130 m away
- 1242 N Selva DrNov 3, 2025Replace hvac · 131 m away
- 1215 S Selva DrJan 18, 2021Replace or modify existing hvac · 135 m away
- 1207 S Selva DrNov 20, 2020Interior remodel only · 139 m away
- 1237 S Selva DrJan 12, 2021Install roofing mountage solar panels · 144 m away