2129 Elmwood Blvd
Dallas, TX 75224
Drain replacement permitted at 2129 Elmwood Blvd
A City of Dallas permit dated April 20, 2026, indicates work to replace a drain under the slab of a pier-and-beam house at 2129 Elmwood Blvd. A prior permit, filed July 21, 2020, covered a gas relay or repair with a test.
Summarized from City of Dallas records · updated Apr 20, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 20, 2026
- since Apr 20, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 2129 Elmwood Blvd
What work is permitted at 2129 Elmwood Blvd?
A City of Dallas residential plumbing permit indicates replacement of a drain under the slab of a pier-and-beam house. The permit was filed April 20, 2026, under number RES-PLM-26-004156.
When was the drain replacement permit filed?
The permit for replacing the drain under the house slab was filed April 20, 2026.
Is a new house being built at 2129 Elmwood Blvd?
The available permit describes drain replacement under an existing pier-and-beam house, not new home construction.
What was the earlier permit for at 2129 Elmwood Blvd?
A City of Dallas permit filed July 21, 2020, described a gas relay or repair with a test. Its permit number is 2007213077.
How much will the work at 2129 Elmwood Blvd cost?
The records provided do not list a valuation or project cost for the drain replacement.
Also being built nearby
All of 75224- 2126 Elmwood BlvdJan 14, 2021Gas test · 13 m away
- 2122 Elmwood BlvdOct 29, 2020Remove existing roof and install new roof · 16 m away
- 2114 Elmwood BlvdOct 28, 2020Gas test · 24 m away
- 2023 Ferndale AveJul 7, 2025Replaced 1" galvanized water service with an 1.25" pex service. installed new main shut off valve and valve box. reconnected to existing front hydrant in the yard · 119 m away
- 2205 Elmwood BlvdJan 20, 2026Gas test · 121 m away
- 2014 Ferndale AveOct 21, 2020Install water heater · 135 m away
- 2034 Elmwood BlvdApr 20, 2026This recommended option includes a complete upgrade of the home’s electrical service to restore power in a safe, reliable, and fully code-compliant manner following fire damage to the existing overhead service.work to be performed includes removal of the damaged and non-compliant existing service equipment, including the current seu service conductors and zinsco panel.installation of a new 200-amp electrical service will be performed in accordance with current code and utility requirements. this includes installation of a rigid, through-the-roof service mast as required by oncor’s most recent service standards to allow for reconnection of power.a new 200-amp outdoor-rated main breaker panel will be installed to replace the existing zinsco panel, bringing the system up to current safety standards and meeting city of dallas requirements.this option includes installation of a 36ka whole-home surge protector, providing protection for the home’s electrical system and appliances against common voltage spikes and surges.a full grounding system will be installed to meet current nec requirements. this includes proper grounding electrode installation and bonding of the electrical system to ensure safety and compliance.additionally, we will install three wireless interconnected smoke detectors to improve life safety within the home. these units will communicate with each other to provide full-home notification in the event of smoke or fire detection.all work will be performed under a city of dallas electrical permit. the installation will be inspected and must pass inspection before the utility provider (oncor) will reconnect power to the home.applicable nec code references:nec 230.50 – protection against physical damagenec 230.54 – overhead service locations (service mast requirements)nec 230.70 – service disconnect requirementsnec 250.50 – grounding electrode systemnec 250.53 – grounding electrode installationnec 285 – surge protective devicesnec 408.36 – overcurrent protectionnec 110.12 – mechanical execution of worknec 210.12 / 210.52 – general circuit & safety requirements (as applicable)additional notes:existing seu service and zinsco panel will be removed and replaced as required for compliance.rigid mast service is required by oncor for reconnection.all work must pass city of dallas inspection prior to utility reconnection.coordination with oncor will be required for final re-energization.power will remain off until all work is completed, inspected, and approved.change order and scope addendum:any changes to the outlined scope of work, including unforeseen conditions, limited or restricted access, or scheduling constraints, may require a change order. any additional work will be discussed and approved by the customer prior to proceeding · 139 m away
- 2218 Elmwood BlvdJun 24, 2025New gas lines inside home and test · 142 m away
- 2030 Elmwood BlvdMar 30, 2026No work performed neighbour's house caught fire and caught their garage on fire oncor took their meter and wanted them to have a permit pulled and a inspection done. our tech said there is no fire damage to the electrical · 145 m away
- 2106 Berkley AveJul 10, 2025Replace 4ton base upflow gas system · 169 m away
- 2102 Berkley AveMay 25, 2026Gas test · 172 m away
- 2010 Elmwood BlvdAug 13, 2025Gas test only · 174 m away