112 S Haskell Ave
Dallas, TX 75226
Gas tests and electrical work marked “no work” at 112 S Haskell
Dallas permit records do not describe a new building at 112 S Haskell Ave; they list gas tests and an electrical permit described as “Clean and show, no work.” The permits were filed December 14, 2025, October 14, 2026, and November 10, 2026.
Summarized from City of Dallas records · updated Nov 10, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Nov 10, 2026
- since Dec 14, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 112 S Haskell Ave
What is being built at 112 S Haskell Ave?
The available Dallas permits do not describe a new building. They list two gas tests and an electrical permit marked “Clean and show, no work.”
Is a new building planned at 112 S Haskell Ave?
The records provided do not identify a new building or construction project at this address. The listed permits cover gas tests and electrical work described as “no work.”
What work was permitted at 112 S Haskell Ave?
The permits list gas tests under COM-PLM-25-003180 and COM-PLM-26-004261, plus an electrical permit described as “Clean and show, no work” under COM-ELC-26-004489.
When were permits filed for 112 S Haskell Ave?
The listed filing dates are December 14, 2025, for a gas test; October 14, 2026, for an electrical permit; and November 10, 2026, for another gas test.
Do the permits describe a renovation at 112 S Haskell Ave?
The permits provided do not describe a renovation. They list two gas tests and an electrical permit whose description says “Clean and show, no work.”
Also being built nearby
All of 75226- 208 S Haskell AveOct 13, 2026Remodel · 93 m away
- 4020 Main StDec 10, 2025Gas test · 117 m away
- 4209 Main StNov 16, 2026Repair of existing gas piping. **this permit authorizes work only for the approved trade. construction, erection, or alteration of any structure will require a separate permit and may require additional trade permits · 120 m away
- 4015 Main StNov 16, 2020Installation of a two door access control system · 127 m away
- 4228 Main StJan 30, 2026Co-0012051024natural gas meter was removed by atmos due to an account issue on file regarding address on file · 135 m away
- 4211 East Side AveMay 20, 2025Temporary power for vacant unit · 141 m away
- 4127 Elm StJun 3, 2026The electrical scope of work is as follows: 3. phase 3 – in edbof a. installation of disconnect for bay 32 and 35 b. demolition of 1 ea bay c. installation of branch wiring for disconnects as listed in 3.a d. installation of conduit and electrical connection between disconnect, control console, and pit · 148 m away
- 4216 East Side AveAug 25, 2026Reset/re-shimmed 325 sq ft of the foundation · 153 m away
- 4218 East Side AveAug 25, 2026Reset/re-shimmed 325 sq ft of the foundation · 155 m away
- 4001 East Side AveNov 28, 2025Major gas repairs to gas service lines / gas test · 163 m away
- 305 S Haskell AveNov 12, 2025Riser rebuild, adding 4 aga stops with gas connectors, with gas drop to appliance · 165 m away
- 130 N Peak StJul 7, 2026Electrical inspection for meter release · 230 m away