4209 Main St
Dallas, TX 75226
Electrical work and one-bay demolition at 4209 Main St
A commercial electrical permit filed May 19, 2026, covers disconnects, branch wiring and conduit, and demolition of one bay at 4209 Main St. Later permits cover testing and certification of a one-inch RPZ on September 2 and repair of existing gas piping on November 13, 2026. The records do not describe a new building or identify a business at the address.
Summarized from City of Dallas records · updated Nov 16, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Nov 16, 2026
- since Nov 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsThe electrical scope of work is as follows: 3. phase 3 – in edbof a. installation of disconnect for bay 5, 6, 7, 11, 12, 34, 35 b. demolition of 1 ea bay c. installation of branch wiring for disconnects as listed in 3.a d. installation of conduit and electrical connection between disconnect, control console, and pit
The electrical scope of work is as follows: 3. phase 3 – in edbof a. installation of disconnect for bay 5, 6, 7, 11, 12, 34, 35 b. demolition of 1 ea bay c. installation of branch wiring for disconnects as listed in 3.a d. installation of conduit and electrical connection between disconnect, control console, and pit
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 4209 Main St
What is being built at 4209 Main St in Dallas?
The available permits describe electrical work, demolition of one bay, RPZ testing and gas-piping repair—not a new building. The electrical permit, COM-ELC-26-002081, was filed May 19, 2026.
Is a building being demolished at 4209 Main St?
A May 19, 2026, electrical permit includes demolition of one bay in its scope. The record does not say that the entire building is being demolished.
What electrical work is planned at 4209 Main St?
Permit COM-ELC-26-002081 covers installation of disconnects for listed bays, branch wiring, and conduit and electrical connections to a control console and pit. It also lists demolition of one bay.
What plumbing permits were filed for 4209 Main St?
A September 2, 2026, commercial plumbing permit, COM-PLM-26-003484, is for one-inch RPZ testing and certification. Permit COM-PLM-26-004389, filed November 13, 2026, covers repair of existing gas piping.
Is a new business opening at 4209 Main St?
The available City of Dallas records do not name a business or say that one is opening. They describe electrical and plumbing work at the address.
Also being built nearby
All of 75226- 4228 Main StJan 30, 2026Co-0012051024natural gas meter was removed by atmos due to an account issue on file regarding address on file · 83 m away
- 4127 Elm StJun 3, 2026The electrical scope of work is as follows: 3. phase 3 – in edbof a. installation of disconnect for bay 32 and 35 b. demolition of 1 ea bay c. installation of branch wiring for disconnects as listed in 3.a d. installation of conduit and electrical connection between disconnect, control console, and pit · 93 m away
- 112 S Haskell AveNov 10, 2026Gas test · 120 m away
- 132 N Peak StAug 13, 2025Install 40 gallon electric water heater in ceiling above restroom · 135 m away
- 130 N Peak StJul 7, 2026Electrical inspection for meter release · 136 m away
- 200 N Peak StOct 10, 2025Mcr the work will include removal of a portion of a double t-beam on a parking structure ramp. this ramp leads from the 1st floor to the second floor and is the last double t-beam connecting to the second floor. contractor will saw cut a portion of the double t-beam's flange at the full length and depth of the t-beam. contractor will then form the the section, install new expansion joint, new rebar into existing beam and adjacent beam. once all formed and rebar in place, contractor will pour the new flange portion · 149 m away
- 4311 Main StFeb 12, 2026Zo bc existing building, last use office. convert from office to multifamily. floor plans provided are existing conditions. sb840 letter provided for authorizing multifamily use · 151 m away
- 4312 Elm StOct 12, 2020Gas relay or repair with test · 156 m away
- 4211 East Side AveMay 20, 2025Temporary power for vacant unit · 158 m away
- 4216 East Side AveAug 25, 2026Reset/re-shimmed 325 sq ft of the foundation · 172 m away
- 4218 East Side AveAug 25, 2026Reset/re-shimmed 325 sq ft of the foundation · 173 m away
- 208 S Haskell AveOct 13, 2026Remodel · 192 m away