130 N Peak St
Dallas, TX 75226
Commercial interior remodel at 130 N Peak St
A commercial interior remodel was permitted at 130 N Peak St on May 15, 2026. Two later electrical permits, filed July 1 and July 7, 2026, cover meter release and an electrical inspection for meter release.
Summarized from City of Dallas records · updated Jul 7, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jul 7, 2026
- since May 15, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 130 N Peak St
What is being built at 130 N Peak St in Dallas?
A City of Dallas permit record describes a commercial interior remodel. The record does not specify the space's use or identify a tenant.
When was the remodel at 130 N Peak St permitted?
The commercial alteration permit, COM-ALT-ADD-26-000296, was filed May 15, 2026.
What are the electrical permits for at 130 N Peak St?
Permit COM-ELC-26-002959, filed July 1, 2026, is for meter release. Permit COM-ELC-26-003034, filed July 7, 2026, is for an electrical inspection for meter release.
Who is moving into 130 N Peak St?
The available City of Dallas permit records do not identify a tenant or occupant.
How much will the project at 130 N Peak St cost?
The available permit records do not report a project cost.
Also being built nearby
All of 75226- 132 N Peak StAug 13, 2025Install 40 gallon electric water heater in ceiling above restroom · 2 m away
- 4311 Main StFeb 12, 2026Zo bc existing building, last use office. convert from office to multifamily. floor plans provided are existing conditions. sb840 letter provided for authorizing multifamily use · 28 m away
- 4312 Elm StOct 12, 2020Gas relay or repair with test · 78 m away
- 200 N Peak StOct 10, 2025Mcr the work will include removal of a portion of a double t-beam on a parking structure ramp. this ramp leads from the 1st floor to the second floor and is the last double t-beam connecting to the second floor. contractor will saw cut a portion of the double t-beam's flange at the full length and depth of the t-beam. contractor will then form the the section, install new expansion joint, new rebar into existing beam and adjacent beam. once all formed and rebar in place, contractor will pour the new flange portion · 89 m away
- 4228 Main StJan 30, 2026Co-0012051024natural gas meter was removed by atmos due to an account issue on file regarding address on file · 100 m away
- 4434 Main StSep 2, 2026Install water heater · 120 m away
- 4320 Main StOct 15, 2026Plugs, outlets, lighting, 1 floor box · 122 m away
- 4409 Main StNov 26, 2025Gas pressure test for gas provider.no work performed · 123 m away
- 4417 Main StOct 5, 2026Zo bc carportrecord sitepr-26-000044: · 132 m away
- 4424 Main StDec 18, 2025No layout changes · 136 m away
- 4209 Main StNov 16, 2026Repair of existing gas piping. **this permit authorizes work only for the approved trade. construction, erection, or alteration of any structure will require a separate permit and may require additional trade permits · 136 m away
- 4406 Elm StJan 27, 2026Gas test · 140 m away