4858 S Buckner Blvd
Dallas, TX 75227
4858 S Buckner Blvd: 1 project on record
City of Dallas lists 1 filing across 1 project at 4858 S Buckner Blvd, Dallas, TX 75227. The most recent, filed January 15, 2021, covers: “Service release no work”.
Compiled from City of Dallas records · updated Jan 15, 2021
- Projects
- 1
- 1 filings
- Latest filing
- Jan 15, 2021
- since Jan 15, 2021
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 4858 S Buckner Blvd
What is being built at 4858 S Buckner Blvd?
The latest filing (City of Dallas permit 2101155007, January 15, 2021) covers service release no work.
How many permits and filings does 4858 S Buckner Blvd have?
1 filing across 1 project, from January 15, 2021 to January 15, 2021.
Is there other construction near 4858 S Buckner Blvd?
Yes. Nearby filings include 4864 S Buckner Blvd (interior finish-out and tenant improvement for an automotive paint and body supply retail store within an existing commercial space. work includes installation of retail shelving paint storage and mixing area cashier counter office work area epoxy flooring interior painting lighting and electrical upgrades hvac adjustments wall and ceiling improvements plumbing fixtures if required and installation of business signage space will be used for retail sales paint mixing storage and customer service related to automotive refinishing products and supplies, May 7, 2026); 4844 S Buckner Blvd (meter release, Jun 2, 2026); 5204 S Buckner Blvd (electrical work for commercial alteration, Feb 17, 2026).
How do I get alerts for new permits at 4858 S Buckner Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75227- 4864 S Buckner BlvdMay 7, 2026Interior finish-out and tenant improvement for an automotive paint and body supply retail store within an existing commercial space. work includes installation of retail shelving paint storage and mixing area cashier counter office work area epoxy flooring interior painting lighting and electrical upgrades hvac adjustments wall and ceiling improvements plumbing fixtures if required and installation of business signage space will be used for retail sales paint mixing storage and customer service related to automotive refinishing products and supplies · 2 m away
- 4844 S Buckner BlvdJun 2, 2026Meter release · 5 m away
- 5204 S Buckner BlvdFeb 17, 2026Electrical work for commercial alteration · 16 m away
- 8160 Moberly LnJan 15, 2026Electrical service · 43 m away
- 8208 Moberly LnJan 4, 2021Site work · 58 m away
- 8224 Moberly LnJan 4, 2021New construction canopy · 64 m away
- 8258 Moberly LnFeb 5, 2026Clean and show/ no work · 77 m away
- 8282 Moberly LnDec 5, 2025Service upgrade 400 amps · 86 m away
- 8161 Moberly LnOct 23, 2025Replace old/outdated 4000a main distribution panel (mdp-1) which feed the whole building with a new 2000a main distribution panel, install a 1200a service rated fusible disconnect on the right side of the transition box (wire from transformer connected to copper buss which feed the mdp-1 inside. disconnect 4 parallel sets of 1000 kcmil from the transition box and install to the top of the 1200a disconnect and run 4 parallel sets of 400 kcmil from the load side of the 1200a disconnect to the copper buss in the transition box to feed the new 2000a mdp -1. we will need the power disconnected from the transformer in different weekends. first weekend will install 1200a disconnect and temporary run power from the load side of the disconnect to power up existing mdp-2, circuits from mdp-1 will temporarily be relocated to mdp-2 which will feed the building temporary while during the week the old mdp-1 will be removed and the new mdp-1 be installed. the second shut down of the transformer will permanently connect the load side of the 1200a disconnect to the new mdp-1 and circuits will be transferred back to the new mdp-1“ · 103 m away
- 8063 Rothington RdJul 20, 202625016_txdot 0581-01-165_dallas_traf signal improv- electrical permit request for installation of traffic signal poles, signal heads, conduit, wiring, and controller equipment. work also includes electrical connections, testing, and coordination to ensure proper operation of upgraded traffic signal systems in accordance with project plans · 163 m away
- 8039 Chariot DrMay 1, 2026Backflow permit · 229 m away
- 4801 S Buckner BlvdOct 16, 2026Plumbing intsall · 240 m away