400-amp electrical service upgrade at 8282 Moberly Ln
A commercial electrical permit indicates a 400-amp service upgrade at 8282 Moberly Ln. The City of Dallas record was filed on December 5, 2025; it does not list a project value or square footage.
Summarized from City of Dallas records · updated Dec 5, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Dec 5, 2025
- since Dec 5, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8282 Moberly Ln
What is being built at 8282 Moberly Ln in Dallas?
A City of Dallas commercial electrical permit describes a service upgrade to 400 amps. The record was filed December 5, 2025.
What is the permit for at 8282 Moberly Ln?
Permit COM-ELC-25-003481 is for a commercial electrical service upgrade to 400 amps.
When was the 8282 Moberly Ln permit filed?
The City of Dallas permit was filed December 5, 2025.
Is a new building planned at 8282 Moberly Ln?
The available record describes a 400-amp electrical service upgrade, not a new building. It does not provide details about other planned work.
How much will the work at 8282 Moberly Ln cost?
The permit record does not list a project cost or reported valuation.
What is permit COM-ELC-25-003481 in Dallas?
It is a City of Dallas commercial electrical permit for a 400-amp service upgrade at 8282 Moberly Ln, filed December 5, 2025.
Also being built nearby
All of 75227- 8258 Moberly LnFeb 5, 2026Clean and show/ no work · 10 m away
- 8161 Moberly LnOct 23, 2025Replace old/outdated 4000a main distribution panel (mdp-1) which feed the whole building with a new 2000a main distribution panel, install a 1200a service rated fusible disconnect on the right side of the transition box (wire from transformer connected to copper buss which feed the mdp-1 inside. disconnect 4 parallel sets of 1000 kcmil from the transition box and install to the top of the 1200a disconnect and run 4 parallel sets of 400 kcmil from the load side of the 1200a disconnect to the copper buss in the transition box to feed the new 2000a mdp -1. we will need the power disconnected from the transformer in different weekends. first weekend will install 1200a disconnect and temporary run power from the load side of the disconnect to power up existing mdp-2, circuits from mdp-1 will temporarily be relocated to mdp-2 which will feed the building temporary while during the week the old mdp-1 will be removed and the new mdp-1 be installed. the second shut down of the transformer will permanently connect the load side of the 1200a disconnect to the new mdp-1 and circuits will be transferred back to the new mdp-1“ · 23 m away
- 8224 Moberly LnJan 4, 2021New construction canopy · 24 m away
- 8208 Moberly LnJan 4, 2021Site work · 31 m away
- 8160 Moberly LnJan 15, 2026Electrical service · 51 m away
- 5204 S Buckner BlvdFeb 17, 2026Electrical work for commercial alteration · 79 m away
- 4844 S Buckner BlvdJun 2, 2026Meter release · 84 m away
- 4858 S Buckner BlvdJan 15, 2021Service release no work · 86 m away
- 4864 S Buckner BlvdMay 7, 2026Interior finish-out and tenant improvement for an automotive paint and body supply retail store within an existing commercial space. work includes installation of retail shelving paint storage and mixing area cashier counter office work area epoxy flooring interior painting lighting and electrical upgrades hvac adjustments wall and ceiling improvements plumbing fixtures if required and installation of business signage space will be used for retail sales paint mixing storage and customer service related to automotive refinishing products and supplies · 87 m away
- 8224 Endicott LnSep 17, 2025Service release no work per oncor need permit · 213 m away
- 8201 Eastpoint DrDec 1, 2025Clean and show · 225 m away
- 4801 S Buckner BlvdOct 16, 2026Plumbing intsall · 240 m away