8224 Endicott Ln
Dallas, TX 75227
Electrical service-release permit filed at 8224 Endicott Ln
A commercial electrical permit for a service release, with no work listed, was filed at 8224 Endicott Ln on September 17, 2025. The permit description says a permit was needed for Oncor; it does not describe construction or a new use for the property.
Summarized from City of Dallas records · updated Sep 17, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Sep 17, 2025
- since Sep 17, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8224 Endicott Ln
What is being built at 8224 Endicott Ln?
The September 17, 2025 permit describes a commercial electrical service release and says no work is being done. It does not identify a new building or other construction.
What does the permit at 8224 Endicott Ln cover?
City of Dallas permit COM-ELC-25-002007 is a commercial electrical permit. Its description says “Service release no work per oncor need permit.”
When was the permit filed for 8224 Endicott Ln?
The City of Dallas permit was filed on September 17, 2025.
Is a new business opening at 8224 Endicott Ln?
The permit record does not identify a business, tenant, or planned opening. It describes only an electrical service release with no work listed.
How much will the work at 8224 Endicott Ln cost?
The permit record does not provide a project valuation or estimated cost.
Also being built nearby
All of 75227- 8330 Endicott LnOct 30, 2026Metal 6' fence only fencing sides and front · 200 m away
- 8161 Moberly LnOct 23, 2025Replace old/outdated 4000a main distribution panel (mdp-1) which feed the whole building with a new 2000a main distribution panel, install a 1200a service rated fusible disconnect on the right side of the transition box (wire from transformer connected to copper buss which feed the mdp-1 inside. disconnect 4 parallel sets of 1000 kcmil from the transition box and install to the top of the 1200a disconnect and run 4 parallel sets of 400 kcmil from the load side of the 1200a disconnect to the copper buss in the transition box to feed the new 2000a mdp -1. we will need the power disconnected from the transformer in different weekends. first weekend will install 1200a disconnect and temporary run power from the load side of the disconnect to power up existing mdp-2, circuits from mdp-1 will temporarily be relocated to mdp-2 which will feed the building temporary while during the week the old mdp-1 will be removed and the new mdp-1 be installed. the second shut down of the transformer will permanently connect the load side of the 1200a disconnect to the new mdp-1 and circuits will be transferred back to the new mdp-1“ · 208 m away
- 8282 Moberly LnDec 5, 2025Service upgrade 400 amps · 213 m away
- 8258 Moberly LnFeb 5, 2026Clean and show/ no work · 221 m away
- 8224 Moberly LnJan 4, 2021New construction canopy · 232 m away
- 8208 Moberly LnJan 4, 2021Site work · 237 m away
- 8160 Moberly LnJan 15, 2026Electrical service · 253 m away
- 4740 S Buckner Blvd · Landscape StructuresMay 26, 2026Install hvac · 281 m away
- 5204 S Buckner BlvdFeb 17, 2026Electrical work for commercial alteration · 284 m away
- 4801 S Buckner BlvdOct 16, 2026Plumbing intsall · 289 m away
- 4844 S Buckner BlvdJun 2, 2026Meter release · 292 m away
- 4858 S Buckner BlvdJan 15, 2021Service release no work · 295 m away