8330 Endicott Ln
Dallas, TX 75227
Roof replacement and fence work permitted at 8330 Endicott Ln
Dallas permits indicate roof replacement and fence work at the commercial property, with filings dated July 28 through October 30, 2026. The August 17 roofing permit describes replacing roofing across approximately 122,500 square feet; two accessory-structure permits describe fence work.
Summarized from City of Dallas records · updated Oct 30, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Oct 30, 2026
- since Jul 28, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsRemove all tpo membrane as well and torch down roofing with iso board and replace with 2 layers of 2.2” iso board mechanically fastened to densdec and metal b-deck substrate. protected with mechanically fastened 60 mil tpo with heat glued seems. approximately 122500 sqrft of roof in total
Remove all tpo membrane as well and torch down roofing with iso board and replace with 2 layers of 2.2” iso board mechanically fastened to densdec and metal b-deck substrate. protected with mechanically fastened 60 mil tpo with heat glued seems. approximately 122500 sqrft of roof in total
City of Dallas permitCommercial Roofing Permit6’ pressed point, commercial grade, powdercoated galvanized steel gloss black.2.5”x2.5” x 9’ postsset in concrete 36” deep1.5” x 1.5” top & bottom rail3/4”x3/4” pickets with 3 3/4” gap2 manual slide gates
6’ pressed point, commercial grade, powdercoated galvanized steel gloss black.2.5”x2.5” x 9’ postsset in concrete 36” deep1.5” x 1.5” top & bottom rail3/4”x3/4” pickets with 3 3/4” gap2 manual slide gates
City of Dallas permitCommercial Accessory Structure Permit
Sources: City of Dallas
Questions about 8330 Endicott Ln
What is being built at 8330 Endicott Ln?
Dallas permits indicate roof replacement and fence work at the commercial property. The records do not describe a new building.
When were permits filed for 8330 Endicott Ln?
The four City of Dallas permits were filed between July 28 and October 30, 2026.
Is the roof being replaced at 8330 Endicott Ln?
Yes. A July 28, 2026 permit says “remove and replace roof,” and an August 17 permit describes a more detailed roof replacement.
How much of the roof is being replaced at 8330 Endicott Ln?
The August 17, 2026 roofing permit describes approximately 122,500 square feet of roof in total.
Are fences being installed at 8330 Endicott Ln?
Two City of Dallas accessory-structure permits describe fence work. One, filed August 3, 2026, also lists two manual sliding gates; another, filed October 30, describes a metal six-foot fence.
What are the permit numbers for work at 8330 Endicott Ln?
The roofing permits are COM-ROOF-26-000194, filed July 28, 2026, and COM-ROOF-26-000192, filed August 17, 2026. The fence permits are COM-ACC-26-000201, filed August 3, and COM-ACC-26-000296, filed October 30.
Also being built nearby
All of 75227- 8424 Endicott LnOct 29, 2020Water heater replacement · 192 m away
- 8224 Endicott LnSep 17, 2025Service release no work per oncor need permit · 200 m away
- 8464 Endicott LnDec 19, 2025Water heater replacement · 278 m away
- 8302 Eastpoint DrSep 4, 2026Need power for alarm system. i live out of town and can't monitor the building so i have a security alarm set up that needs the power · 303 m away
- 8311 Eastpoint DrDec 10, 2025Replace gas line in suite 100 · 315 m away
- 8358 Moberly LnJun 12, 2026Beauty salon space · 341 m away
- 8161 Moberly LnOct 23, 2025Replace old/outdated 4000a main distribution panel (mdp-1) which feed the whole building with a new 2000a main distribution panel, install a 1200a service rated fusible disconnect on the right side of the transition box (wire from transformer connected to copper buss which feed the mdp-1 inside. disconnect 4 parallel sets of 1000 kcmil from the transition box and install to the top of the 1200a disconnect and run 4 parallel sets of 400 kcmil from the load side of the 1200a disconnect to the copper buss in the transition box to feed the new 2000a mdp -1. we will need the power disconnected from the transformer in different weekends. first weekend will install 1200a disconnect and temporary run power from the load side of the disconnect to power up existing mdp-2, circuits from mdp-1 will temporarily be relocated to mdp-2 which will feed the building temporary while during the week the old mdp-1 will be removed and the new mdp-1 be installed. the second shut down of the transformer will permanently connect the load side of the 1200a disconnect to the new mdp-1 and circuits will be transferred back to the new mdp-1“ · 386 m away
- 4854 Olson DrMar 12, 2026Qteam qr applying for a remodel permit for the most recent site conditions of the site to receive new certificate of occupancy · 391 m away
- 4850 Olson DrOct 19, 2020Install lawn sprinkler · 393 m away
- 8282 Moberly LnDec 5, 2025Service upgrade 400 amps · 398 m away
- 8258 Moberly LnFeb 5, 2026Clean and show/ no work · 407 m away
- 8224 Moberly LnJan 4, 2021New construction canopy · 420 m away