8311 Eastpoint Dr
Dallas, TX 75227
Storage rack installation and gas line work at 8311 Eastpoint Dr
Permits at 8311 Eastpoint Dr indicate installation of a high-pile storage rack for motor vehicle parts and paper packaging materials. A separate permit filed December 10, 2025, covers replacing the gas line in suite 100; the rack permit was filed August 1, 2025.
Summarized from City of Dallas records · updated Dec 10, 2025
- Projects
- 4
- 4 filings
- Latest filing
- Dec 10, 2025
- since Aug 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
4 projectsQteam qr installation of high-pile storage rack for hs commodity code no. 87087000, “parts and accessories of the motor vehicles of headings 8701 to 8705” and “road wheels and parts and accessories thereof” and hs commodity code no. 4819100000 “cartons, boxes, cases, bags and other packing containers, of paper, paperboard, cellulose wadding or webs of cellulose fibres; box files, letter trays, and similar articles, of paper or paperboard, of a kind used in offices, shops or the like
Qteam qr installation of high-pile storage rack for hs commodity code no. 87087000, “parts and accessories of the motor vehicles of headings 8701 to 8705” and “road wheels and parts and accessories thereof” and hs commodity code no. 4819100000 “cartons, boxes, cases, bags and other packing containers, of paper, paperboard, cellulose wadding or webs of cellulose fibres; box files, letter trays, and similar articles, of paper or paperboard, of a kind used in offices, shops or the like
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 8311 Eastpoint Dr
What is being built at 8311 Eastpoint Dr?
Permits indicate a high-pile storage rack installation and gas line replacement, not a new building. The rack permit was filed August 1, 2025, and the gas line permit was filed December 10, 2025.
Is a new warehouse being built at 8311 Eastpoint Dr in Dallas?
The records provided do not show a new warehouse construction permit. They show a permit for installing high-pile storage racks.
What will be stored in the racks at 8311 Eastpoint Dr?
The August 1, 2025, permit describes storage for motor vehicle parts and accessories, along with paper cartons and other packaging materials.
What work is planned for suite 100 at 8311 Eastpoint Dr?
A City of Dallas commercial plumbing permit filed December 10, 2025, covers replacing the gas line in suite 100.
When were permits filed for 8311 Eastpoint Dr?
The high-pile storage rack permit, COM-ALT-ADD-25-000854, was filed August 1, 2025. The gas line permit, COM-PLM-25-003036, was filed December 10, 2025.
Is a business opening at 8311 Eastpoint Dr?
The available permits do not identify a business opening or name an occupant. They describe a storage rack installation and gas line replacement.
Also being built nearby
All of 75227- 8302 Eastpoint DrSep 4, 2026Need power for alarm system. i live out of town and can't monitor the building so i have a security alarm set up that needs the power · 19 m away
- 8201 Eastpoint DrDec 1, 2025Clean and show · 307 m away
- 8330 Endicott LnOct 30, 2026Metal 6' fence only fencing sides and front · 315 m away
- 5111 Catron DrJul 31, 2026Vacant building needs clean & show to get power 5111 catron drno work to be done · 347 m away
- 8181 Eastpoint DrNov 24, 2020Addition of one access controlled door · 356 m away
- 8224 Endicott LnSep 17, 2025Service release no work per oncor need permit · 362 m away
- 8424 Endicott LnOct 29, 2020Water heater replacement · 376 m away
- 8161 Moberly LnOct 23, 2025Replace old/outdated 4000a main distribution panel (mdp-1) which feed the whole building with a new 2000a main distribution panel, install a 1200a service rated fusible disconnect on the right side of the transition box (wire from transformer connected to copper buss which feed the mdp-1 inside. disconnect 4 parallel sets of 1000 kcmil from the transition box and install to the top of the 1200a disconnect and run 4 parallel sets of 400 kcmil from the load side of the 1200a disconnect to the copper buss in the transition box to feed the new 2000a mdp -1. we will need the power disconnected from the transformer in different weekends. first weekend will install 1200a disconnect and temporary run power from the load side of the disconnect to power up existing mdp-2, circuits from mdp-1 will temporarily be relocated to mdp-2 which will feed the building temporary while during the week the old mdp-1 will be removed and the new mdp-1 be installed. the second shut down of the transformer will permanently connect the load side of the 1200a disconnect to the new mdp-1 and circuits will be transferred back to the new mdp-1“ · 392 m away
- 8282 Moberly LnDec 5, 2025Service upgrade 400 amps · 415 m away
- 8258 Moberly LnFeb 5, 2026Clean and show/ no work · 425 m away
- 8464 Endicott LnDec 19, 2025Water heater replacement · 431 m away
- 8224 Moberly LnJan 4, 2021New construction canopy · 438 m away