8201 Eastpoint Dr
Dallas, TX 75227
Commercial electrical permit filed at 8201 Eastpoint Dr
A commercial electrical permit at 8201 Eastpoint Dr is described as “Clean and show”; the record does not specify construction or other electrical work. The City of Dallas permit was filed on December 1, 2025, under permit number COM-ELC-25-003388.
Summarized from City of Dallas records · updated Dec 1, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 1, 2025
- since Dec 1, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 8201 Eastpoint Dr
What is being built at 8201 Eastpoint Dr in Dallas?
The City of Dallas record lists a commercial electrical permit described as “Clean and show.” It does not identify a new building or specify construction work.
What work does permit COM-ELC-25-003388 cover?
The permit description is “Clean and show.” The record does not provide further details about the work.
When was the permit filed for 8201 Eastpoint Dr?
The City of Dallas permit was filed on December 1, 2025.
Is a new business opening at 8201 Eastpoint Dr?
The permit record does not name a business or say that a new business is opening.
How much is the project at 8201 Eastpoint Dr expected to cost?
The record does not report a project cost or permit valuation.
Also being built nearby
All of 75227- 8181 Eastpoint DrNov 24, 2020Addition of one access controlled door · 56 m away
- 8161 Moberly LnOct 23, 2025Replace old/outdated 4000a main distribution panel (mdp-1) which feed the whole building with a new 2000a main distribution panel, install a 1200a service rated fusible disconnect on the right side of the transition box (wire from transformer connected to copper buss which feed the mdp-1 inside. disconnect 4 parallel sets of 1000 kcmil from the transition box and install to the top of the 1200a disconnect and run 4 parallel sets of 400 kcmil from the load side of the 1200a disconnect to the copper buss in the transition box to feed the new 2000a mdp -1. we will need the power disconnected from the transformer in different weekends. first weekend will install 1200a disconnect and temporary run power from the load side of the disconnect to power up existing mdp-2, circuits from mdp-1 will temporarily be relocated to mdp-2 which will feed the building temporary while during the week the old mdp-1 will be removed and the new mdp-1 be installed. the second shut down of the transformer will permanently connect the load side of the 1200a disconnect to the new mdp-1 and circuits will be transferred back to the new mdp-1“ · 206 m away
- 8282 Moberly LnDec 5, 2025Service upgrade 400 amps · 225 m away
- 8258 Moberly LnFeb 5, 2026Clean and show/ no work · 230 m away
- 8224 Moberly LnJan 4, 2021New construction canopy · 237 m away
- 8208 Moberly LnJan 4, 2021Site work · 240 m away
- 4864 S Buckner BlvdMay 7, 2026Interior finish-out and tenant improvement for an automotive paint and body supply retail store within an existing commercial space. work includes installation of retail shelving paint storage and mixing area cashier counter office work area epoxy flooring interior painting lighting and electrical upgrades hvac adjustments wall and ceiling improvements plumbing fixtures if required and installation of business signage space will be used for retail sales paint mixing storage and customer service related to automotive refinishing products and supplies · 246 m away
- 4858 S Buckner BlvdJan 15, 2021Service release no work · 247 m away
- 4844 S Buckner BlvdJun 2, 2026Meter release · 250 m away
- 8160 Moberly LnJan 15, 2026Electrical service · 251 m away
- 5204 S Buckner BlvdFeb 17, 2026Electrical work for commercial alteration · 256 m away
- 4999 S Buckner BlvdNov 18, 2025Need inspection for meter release · 278 m away