Electrical panel upgrade permitted at 8821 Westglen Dr
A residential electrical permit covers upgrading the panel to 200 amps with overhead service at 8821 Westglen Dr. The City of Dallas record was filed on April 16, 2026, under permit RES-ELC-26-002159.
Summarized from City of Dallas records · updated Apr 16, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 16, 2026
- since Apr 16, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8821 Westglen Dr
What work is planned at 8821 Westglen Dr?
A City of Dallas residential electrical permit covers a panel upgrade to 200 amps with overhead service.
When was the electrical permit filed for 8821 Westglen Dr?
The permit was filed on April 16, 2026. Its number is RES-ELC-26-002159.
Is a new home being built at 8821 Westglen Dr?
The record describes an electrical panel upgrade, not new home construction.
What is permit RES-ELC-26-002159 for?
It is a City of Dallas residential electrical permit for upgrading the panel to 200 amps with overhead service.
Who issued the permit for 8821 Westglen Dr?
The permit record is from the City of Dallas and is dated April 16, 2026.
Also being built nearby
All of 75228- 8912 Westglen DrJul 14, 2026Replace 70 ft of cast iron with pvc underneath a pier and beam home · 81 m away
- 8823 Stanwood DrOct 21, 2026Install inground awimming pool and spa · 102 m away
- 8811 Vinewood DrJun 25, 2026One 40 gallon gas water heater in hallway closet · 102 m away
- 8819 Stanwood DrOct 1, 2025New gas service from meter to house · 104 m away
- 8720 Vinewood DrSep 29, 2020Install swimming pool · 107 m away
- 8731 Vinewood DrSep 16, 2026Replace sewer lines in crawl space · 113 m away
- 8705 Vinewood DrJul 30, 2026Remove and replace existing roofing system - laminated asphalt shingles, ridge cap, asphalt starter, drip edge, synthetic underlayment and all vents. no decking being replaced · 128 m away
- 8903 Vinewood DrJul 23, 2026Electrical repairs · 146 m away
- 8906 Stanwood DrJun 11, 2025Electrical service repair due to storm damages · 151 m away
- 8915 Vinewood DrNov 3, 2025Replacing furnace, evap coil and condenser. adding return air duct · 154 m away
- 8915 Stanwood DrJul 21, 2026Nsfaa the balcony is an elevated, wood-framed structure. its outboard edge is carried by a built-up girder composed of threeplies of 1-3/4 inch by 18 inch laminated veneer lumber (lvl), which bears on existing steel columns. the balcony floorjoists frame into this girder and are attached with metal joist hangers. a stone deck finish over a self-adheredwaterproofing membrane was installed above the framing at the top of the girder.ces observed advanced, moisture-driven decay of the lvl girder. the individual plies have delaminated and separated,and over substantial portions of the member the wood has deteriorated to a soft, fibrous condition, with areas reduced toloose and friable debris. this deterioration is consistent with prolonged entrapment of water within the girder beneath thedeck finish and membrane. laminated veneer lumber is an interior product and is not manufactured for sustained exposureto moisture.based on these observations, it is ces’s professional opinion that the girder has sustained a significant loss of cross-section and can no longer be relied upon to safely support the balcony. given the extent and distribution of the decay, alocalized or partial repair is not appropriate, and the girder must be removed and replaced in its entirety. until the memberis shored, the balcony should be treated as structurally compromised, and foot traffic and imposed loads should be keptoff of it.before the girder is removed, the balcony floor joists must be temporarily shored to relieve the existing girder of all load.ces recommends wood shoring consisting of 4x6 posts spaced at 24 inches on center, set on a continuous 2x6 bottom(sill) plate and supporting a continuous double 2x6 top plate positioned against the underside of the joists just inboard ofthe girder. the shoring shall bear on a firm, level surface capable of supporting the imposed loads, and it shall be plumbedand secured against displacement. the existing steel columns are to remain; they shall be independently braced to holdthem in position and to protect them from displacement or damage during removal of the girder and until the replacementgirder is fully installed.once the shoring and column bracing are in place and confirmed to be carrying the balcony load, the joist hangers andthe deteriorated three-ply lvl girder may be removed. a new girder consisting of three plies of 1-3/4 inch by 18 inchlvl, matching the existing member, shall be installed on the existing columns using connections equivalent to or betterthan the original. each floor joist shall then be reconnected to the new girder with new galvanized joist hangers of theappropriate size. the temporary shoring and column bracing shall remain in place until the new girder and all joistconnections are complete.because the original failure resulted from moisture reaching and remaining in contact with the lvl, the replacementgirder must be protected against a recurrence. the new girder and the adjacent framing shall be fully flashed and integratedwith a continuous, properly lapped waterproofing membrane, and the deck assembly shall be detailed to drain waterpositively away from the framing. any concealed source of water that contributed to the original deterioration should beidentified and corrected as part of this work.these recommendations are based on visual observation of the accessible conditions and on the photographs provided;ces has not performed an analysis of the remaining capacity of the existing framing or an evaluation of concealedconditions beyond those exposed. the contractor is responsible for the means, methods, sequencing, and safety of theshoring and demolition operations, including compliance with applicable osha requirements · 158 m away
- 8619 Westglen DrJun 6, 2026Construct new 8'-6" tall cedar fence with steel poles and solar powered sliding gate across the driveway · 176 m away