8822 Tudor Pl
Dallas, TX 75228
Roof replacement permitted at 8822 Tudor Pl
A residential re-roof at 8822 Tudor Pl was permitted on July 21, 2026. The City of Dallas permit describes Tamko Titan XT Class 3 impact-resistant shingles.
Summarized from City of Dallas records · updated Jul 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 21, 2026
- since Jul 21, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 8822 Tudor Pl
What work is being done at 8822 Tudor Pl?
A City of Dallas permit records a residential re-roof using Tamko Titan XT Class 3 impact-resistant shingles. The permit number is RES-ROOF-26-001244.
When was the roof permit issued for 8822 Tudor Pl?
The permit record is dated July 21, 2026.
What kind of shingles are being installed at 8822 Tudor Pl?
The permit description specifies Tamko Titan XT Class 3 impact-resistant shingles.
Is a new home being built at 8822 Tudor Pl?
The record provided is for a residential roofing permit describing a re-roof, not a new-home construction permit.
Is there other roofing work on Tudor Pl?
A City of Dallas permit record dated July 21, 2026, also describes a re-roof at 8820 Tudor Pl, next door to 8822.
Also being built nearby
All of 75228- 8824 Tudor PlOct 30, 20264 ton gas complete system replacement of existing equipment. system is horizontal in attic with pull down ladder access on second floor. condenser is at ground level by garage door · 2 m away
- 8820 Tudor PlJul 21, 2026Re-roof with class 3 impact resistant tamko titan · 2 m away
- 8821 Tudor PlSep 21, 2026Hvac install4 ton gas complete system horizontal · 13 m away
- 8813 Tudor PlNov 6, 2025Replace water heater, install new 50 gallon gas water heater in attic · 17 m away
- 8786 Ferguson RdJun 6, 2025Wire theft. repulling service wires from oncor transformewr to building tap can · 102 m away
- 2611 Lanecrest DrJun 16, 2025Upgrading meter base and installing a 200 amp service disconnect · 110 m away
- 8712 Tudor PlJan 14, 2026Gas testing · 113 m away
- 8708 Tudor PlApr 2, 2026Gas test · 114 m away
- 2430 Springhill DrJan 8, 2026Cast iron replacement to pvc · 144 m away
- 2324 Springhill DrApr 14, 2026Install 6 concrete pressed piers and reshim interior concrete supports as required · 151 m away
- 2314 Springhill StDec 11, 2020Remove existing roof and install new roof · 157 m away
- 2435 Springhill StNov 11, 2020Gas test · 157 m away