9801 Royal Ln
Dallas, TX 75231
Permits show apartment repairs at 9801 Royal Ln
Dallas permits indicate repair work at an apartment property at 9801 Royal Ln, rather than a new building. Filings from May 7 to June 4, 2025, cover electrical rewiring after a fire, a two-carport roof repair, and replacement of an upstairs HVAC unit.
Summarized from City of Dallas records · updated Jun 4, 2025
- Projects
- 3
- 3 filings
- Latest filing
- Jun 4, 2025
- since May 7, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsSources: City of Dallas
Questions about 9801 Royal Ln
What is being built at 9801 Royal Ln in Dallas?
The available permits do not describe a new building. They indicate repairs at an apartment property, including electrical work, a carport roof repair, and HVAC replacement.
What work was permitted at 9801 Royal Ln?
Three City of Dallas permits filed from May 7 to June 4, 2025, cover rewiring after part of an apartment caught fire, repair of two carport roofs, and replacement of an upstairs HVAC unit.
When were permits filed for 9801 Royal Ln?
The earliest listed filing was May 7, 2025, for electrical work (permit RES-ELC-25-000011). The latest was June 4, 2025, for HVAC replacement (permit RES-MEC-25-000529).
Was there a fire at 9801 Royal Ln in Dallas?
A May 7, 2025, electrical permit says part of an apartment caught fire and that wiring and boxes needed replacement. The record does not provide further details about the incident.
Is a new apartment building going up at 9801 Royal Ln?
The listed permits do not indicate new apartment construction. They describe repairs, including electrical rewiring, carport roof work, and HVAC replacement.
Also being built nearby
All of 75231- 8407 Oak StreamFeb 24, 2026100 ft gas line replacement to new location set by atmos energy · 129 m away
- 8515 Coppertowne LnJun 29, 20268515 coppertowne install 8 concrete pilings to stabilize foundation · 145 m away
- 8510 Coppertowne LnJun 11, 2025Dig up an replace 3/4" main water line shutoff and 1/2 shutoff with new hose faucet. put 6" of pea gravel in box · 180 m away
- 8401 Skillman StOct 21, 2026The current boiler system adjacent to building 8 is non-operational due to the fire box burning through the back, necessitating replacement to restore reliable function and address heating and water needs.we recommend replacing the existing boiler system with a new ray pack boiler, accompanied by a single-story vent package, a 200-gallon storage tank, and an optimized pump assembly utilizing copper components. additionally, new water valves will be installed in the boiler room, and our team will ensure the removal of the old system after installation. - guarantees efficient operation and enhanced system reliability.- addresses safety concerns and improves long-term performance · 181 m away
- 8555 Fair Oaks XingMay 14, 2026Building f #510 install 2.5 ton hvac system · 196 m away
- 8454 Brittania WayJun 1, 2026Replace 1- 2 ton air handler and 1- 1.5 ton heat pump hvac system · 197 m away
- 8427 Barnaby StSep 1, 2026Relocate main indoor disconnect to outside with updated grounding · 199 m away
- 8426 Barnaby StSep 2, 2025Tub to shower conversion in standard flooring, set kohler pan 60x30, set valve“ · 202 m away
- 8522 Coppertowne LnDec 12, 2025Replace complete system · 209 m away
- 8470 Brittania WayNov 18, 2026Install new electrical in addition · 222 m away
- 9608 Robin SongJun 3, 2025Replacing a 4 ton gas complete system · 228 m away
- 8303 Skillman StNov 21, 2025Gas meter relocate for boiler room · 254 m away