1302 Aldenwood Dr
Dallas, TX 75232
1302 Aldenwood Dr: 2 projects on record
City of Dallas lists 2 filings across 2 projects at 1302 Aldenwood Dr, Dallas, TX 75232. The most recent, filed January 22, 2021, covers: “Install water heater”.
Compiled from City of Dallas records · updated Jan 22, 2021
- Projects
- 2
- 2 filings
- Latest filing
- Jan 22, 2021
- since Jan 22, 2021
- Largest scope
- —
- Listed value
- $8K
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 1302 Aldenwood Dr
What is being built at 1302 Aldenwood Dr?
The latest filing (City of Dallas permit 2101223005, January 22, 2021) covers install water heater.
How many permits and filings does 1302 Aldenwood Dr have?
2 filings across 2 projects, from January 22, 2021 to January 22, 2021.
How much is the construction at 1302 Aldenwood Dr worth?
Permits at this address list about $8K in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 1302 Aldenwood Dr?
Yes. Nearby filings include 1306 Aldenwood Dr (gas meter release, Nov 5, 2026); 1316 Aldenwood Dr (replace 3 ton complete gas system, Jul 18, 2025); 1305 Taperwicke Dr (federal pacific panel replacement, changing electrical service, Sep 26, 2025).
How do I get alerts for new permits at 1302 Aldenwood Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75232- 1306 Aldenwood DrNov 5, 2026Gas meter release · 6 m away
- 1316 Aldenwood DrJul 18, 2025Replace 3 ton complete gas system · 21 m away
- 1305 Taperwicke DrSep 26, 2025Federal pacific panel replacement, changing electrical service · 83 m away
- 1306 Mirage Canyon DrMay 8, 2026Reroof · 94 m away
- 1331 Taperwicke DrDec 16, 2025Gas water heater replacement · 97 m away
- 1316 Taperwicke DrJun 19, 2026Replace 2.5 ton complete gas system · 99 m away
- 1336 Mirage Canyon DrJul 20, 2026Mcr with battery to install a roof mounted solar pv system including batteries - 34 modules - 13.940 kw dc, 10.140 kw ac system size · 112 m away
- 1225 Aldenwood DrSep 4, 202540-gallon gas water heater replacement“ · 115 m away
- 1329 Mirage Canyon DrApr 21, 2026Re-roofing · 117 m away
- 1335 Mirage Canyon DrAug 12, 2026Rueshelia duncan- roof-mounted photovoltaic (pv) solar system with energy storage system (ess) for a residential installation. plans have been reviewed and approved by a qualified third-party plan reviewer in accordance with texas local government code chapter 247 (sb 1202), including stamped plans and letter of compliance · 121 m away
- 1214 Aldenwood DrDec 21, 2020Remove existing roof and install new roof · 129 m away
- 1231 Taperwicke DrNov 3, 202550 gallon/natural gas water heater replacement · 131 m away