1336 Mirage Canyon Dr
Dallas, TX 75232
Roof-mounted solar and battery system permitted in Dallas
A roof-mounted solar photovoltaic system with battery storage was permitted at 1336 Mirage Canyon Dr on July 20, 2026. The City of Dallas permit describes 34 modules and a system size of 13.940 kW DC and 10.140 kW AC. Earlier permits in May 2025 covered an electrical service upgrade and a sanitary sewer line repair.
Summarized from City of Dallas records · updated Jul 20, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Jul 20, 2026
- since May 26, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsMcr with battery to install a roof mounted solar pv system including batteries - 34 modules - 13.940 kw dc, 10.140 kw ac system size
Mcr with battery to install a roof mounted solar pv system including batteries - 34 modules - 13.940 kw dc, 10.140 kw ac system size
City of Dallas permitResidential Solar/PV Permit
Sources: City of Dallas
Questions about 1336 Mirage Canyon Dr
What is being built at 1336 Mirage Canyon Dr?
A City of Dallas permit describes a roof-mounted solar PV system with batteries, including 34 modules. The permit was filed July 20, 2026.
Is there a new solar system planned for 1336 Mirage Canyon Dr in Dallas?
Yes. Permit RES-SOLAR-26-000361, dated July 20, 2026, is for a roof-mounted solar system with battery storage.
How large is the solar system at 1336 Mirage Canyon Dr?
The permit lists a system size of 13.940 kW DC and 10.140 kW AC, with 34 modules.
Will the solar installation at 1336 Mirage Canyon Dr include a battery?
Yes. The permit description specifies batteries as part of the roof-mounted solar PV system.
What other permits were filed for 1336 Mirage Canyon Dr?
City of Dallas records show an electrical service upgrade permit dated May 29, 2025, and a permit for tunneling under the building and repairing a sanitary sewer line dated May 26, 2025.
Also being built nearby
All of 75232- 1335 Mirage Canyon DrAug 12, 2026Rueshelia duncan- roof-mounted photovoltaic (pv) solar system with energy storage system (ess) for a residential installation. plans have been reviewed and approved by a qualified third-party plan reviewer in accordance with texas local government code chapter 247 (sb 1202), including stamped plans and letter of compliance · 13 m away
- 1329 Mirage Canyon DrApr 21, 2026Re-roofing · 17 m away
- 1306 Mirage Canyon DrMay 8, 2026Reroof · 45 m away
- 1316 Aldenwood DrJul 18, 2025Replace 3 ton complete gas system · 102 m away
- 1306 Aldenwood DrNov 5, 2026Gas meter release · 109 m away
- 1335 Kirnwood DrMay 11, 2026Replacing 4 ton heat pump/air hanlder hvac system · 111 m away
- 1302 Aldenwood DrJan 22, 2021Install water heater · 112 m away
- 1232 Mirage Canyon DrJan 12, 2021Remodel existing plumbing · 156 m away
- 1432 Aldenwood DrApr 15, 2026Mcr installation of 11 roof mounted pv solar panels · 158 m away
- 1220 Mirage Canyon DrNov 3, 2026Nsfaa construction of the accessory metal building 20x20x10 with concrete works non-habitable.no mepuse: storage · 171 m away
- 1228 Kirnwood DrSep 30, 2020Replace or modify existing hvac · 172 m away
- 1331 Taperwicke DrDec 16, 2025Gas water heater replacement · 175 m away