1306 Aldenwood Dr
Dallas, TX 75232
Electrical service work and gas meter release in Dallas
Dallas permits indicate residential electrical service work at 1306 Aldenwood Dr, including a new 200-amp meter base, disconnect, and panel. The electrical permit was filed September 11, 2026, and a gas meter release permit was filed November 5, 2026.
Summarized from City of Dallas records · updated Nov 5, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Nov 5, 2026
- since Sep 11, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 1306 Aldenwood Dr
What work is permitted at 1306 Aldenwood Dr?
Permits list replacement of the old electrical service with a new 200-amp meter base, disconnect, and panel, along with a gas meter release.
When were permits filed for 1306 Aldenwood Dr?
The electrical permit, RES-ELC-26-005607, was filed September 11, 2026. The gas meter release permit, RES-PLM-26-011944, was filed November 5, 2026.
Is a new building planned at 1306 Aldenwood Dr?
The records provided show residential electrical work and a gas meter release, not a new building permit.
What electrical work is listed for 1306 Aldenwood Dr?
The September 11, 2026 permit describes removing the old electrical service and installing a 200-amp meter base, disconnect, and panel.
What does the gas permit at 1306 Aldenwood Dr cover?
The November 5, 2026 City of Dallas permit is for a gas meter release.
Also being built nearby
All of 75232- 1302 Aldenwood DrJan 22, 2021Install water heater · 6 m away
- 1316 Aldenwood DrJul 18, 2025Replace 3 ton complete gas system · 15 m away
- 1305 Taperwicke DrSep 26, 2025Federal pacific panel replacement, changing electrical service · 82 m away
- 1306 Mirage Canyon DrMay 8, 2026Reroof · 94 m away
- 1331 Taperwicke DrDec 16, 2025Gas water heater replacement · 94 m away
- 1316 Taperwicke DrJun 19, 2026Replace 2.5 ton complete gas system · 98 m away
- 1336 Mirage Canyon DrJul 20, 2026Mcr with battery to install a roof mounted solar pv system including batteries - 34 modules - 13.940 kw dc, 10.140 kw ac system size · 109 m away
- 1329 Mirage Canyon DrApr 21, 2026Re-roofing · 115 m away
- 1335 Mirage Canyon DrAug 12, 2026Rueshelia duncan- roof-mounted photovoltaic (pv) solar system with energy storage system (ess) for a residential installation. plans have been reviewed and approved by a qualified third-party plan reviewer in accordance with texas local government code chapter 247 (sb 1202), including stamped plans and letter of compliance · 118 m away
- 1225 Aldenwood DrSep 4, 202540-gallon gas water heater replacement“ · 121 m away
- 1214 Aldenwood DrDec 21, 2020Remove existing roof and install new roof · 135 m away
- 1231 Taperwicke DrNov 3, 202550 gallon/natural gas water heater replacement · 136 m away