Paint booths and mix rooms to be replaced at 3331 Haggar Way
A City of Dallas permit filed November 4, 2026, covers replacing two existing drive-through paint booths and four existing paint mix rooms with new ones at 3331 Haggar Way. The record lists the work as a commercial alteration and addition permit.
Summarized from City of Dallas records · updated Nov 4, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Nov 4, 2026
- since Nov 4, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectZo bc replace existing 2 drive through paint booths with new ones.replace existing 4 paint mix rooms with new ones
Zo bc replace existing 2 drive through paint booths with new ones.replace existing 4 paint mix rooms with new ones
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 3331 Haggar Way
What is being built at 3331 Haggar Way?
A City of Dallas permit describes replacing two existing drive-through paint booths and four existing paint mix rooms with new ones. It was filed November 4, 2026 under permit COM-ALT-ADD-26-002455.
Are new paint booths planned at 3331 Haggar Way?
The permit describes replacing two existing drive-through paint booths with new ones. It does not describe adding more booths.
Are the paint mix rooms at 3331 Haggar Way being replaced?
Yes. The November 4, 2026 permit covers replacing four existing paint mix rooms with new ones.
Is a new building being built at 3331 Haggar Way?
The permit describes replacement work on existing paint booths and paint mix rooms, not construction of a new building.
What is being changed near Sewell Premium Showroom?
A permit at 3331 Haggar Way covers replacing two drive-through paint booths and four paint mix rooms. The address is about 316 meters from Sewell Premium Showroom at 3500 Manor Way.
Also being built nearby
All of 75235- 6206 Peeler StOct 7, 2026Zo bc replace 1-existing ctof with new ones.replace 2-existing paint mix rooms with new ones · 19 m away
- 6120 Peeler StJun 15, 2026Demolition and removal of approximately 4000 square feet of existing concrete slab foundation, followed by prep and replacement of new concrete slab · 63 m away
- 3333 Atwell StOct 7, 2020Install lawn sprinkler · 196 m away
- 3316 Atwell StNov 19, 2020Install fence · 208 m away
- 3202 Manor WayNov 14, 2025Someone tried to break into box - only cover was missing - no work needed to be done · 249 m away
- 6113 Lemmon AveJun 11, 2025Replace the 1/2" rpz at the drink machine for the co2 line · 287 m away
- 3305 Manor WaySep 21, 2020Electrical repairs · 303 m away
- 3500 Manor Way · Sewell CorporationSep 17, 202615,700 sq ft - 1. tear off existing roofing down to existing deck. 2. sweep deck free of gravel, dirt and debris. 3. mechanically fasten one layer of 4.3" of iso (r-25 value required by the city) to the existing deck. 4. install 1 ply white 60 mil tpo single ply roofing membrane in a fully adhered application over new insulation. *no structrual changes*building is occupied · 316 m away
- 6262 Cedar Springs RdOct 22, 2020Install new hvac · 363 m away
- 6021 Cedar Springs RdMar 25, 20264x4x4 access pit in warehouse to expose vent stack and p trap in that area. install double sweep cleanouts · 373 m away
- 6300 Cedar Springs RdApr 8, 2026Replace section of 4" sewer line · 388 m away
- 6303 Cedar Springs RdNov 16, 2026Primary and paint booth wiring · 400 m away