6120 Peeler St
Dallas, TX 75235
Concrete slab foundation replacement at 6120 Peeler St
A City of Dallas permit filed June 15, 2026, covers removing about 4,000 square feet of existing concrete slab foundation at 6120 Peeler St and preparing the site for a replacement slab. The permit record does not identify a new building or occupant.
Summarized from City of Dallas records · updated Jun 15, 2026
- Projects
- 4
- 4 filings
- Latest filing
- Jun 15, 2026
- since Oct 12, 2020
- Largest scope
- —
- Listed value
- $17K
- partial · often understated
Permit & project history
4 projectsDemolition and removal of approximately 4000 square feet of existing concrete slab foundation, followed by prep and replacement of new concrete slab
Demolition and removal of approximately 4000 square feet of existing concrete slab foundation, followed by prep and replacement of new concrete slab
City of Dallas permitCommercial Foundation Repair
Sources: City of Dallas
Questions about 6120 Peeler St
What work is planned at 6120 Peeler St in Dallas?
A City of Dallas permit covers demolition and removal of approximately 4,000 square feet of existing concrete slab foundation, followed by preparation and installation of a new slab. The permit number is COM-FDN-26-000073.
When was the 6120 Peeler St permit filed?
The City of Dallas permit was filed June 15, 2026.
Is a new building being built at 6120 Peeler St?
The permit record describes removing and replacing a concrete slab foundation. It does not identify construction of a new building.
How much concrete slab is being replaced at 6120 Peeler St?
The permit describes demolition and removal of approximately 4,000 square feet of existing concrete slab foundation, followed by replacement with a new slab.
What is happening near Sewell Premium Showroom on Manor Way?
At 6120 Peeler St, about 369 meters from Sewell Premium Showroom, a June 15, 2026, City of Dallas permit covers removal and replacement of approximately 4,000 square feet of concrete slab foundation.
Also being built nearby
All of 75235- 3331 Haggar WayNov 4, 2026Zo bc replace existing 2 drive through paint booths with new ones.replace existing 4 paint mix rooms with new ones · 63 m away
- 6206 Peeler StOct 7, 2026Zo bc replace 1-existing ctof with new ones.replace 2-existing paint mix rooms with new ones · 66 m away
- 3333 Atwell StOct 7, 2020Install lawn sprinkler · 138 m away
- 3316 Atwell StNov 19, 2020Install fence · 149 m away
- 3202 Manor WayNov 14, 2025Someone tried to break into box - only cover was missing - no work needed to be done · 287 m away
- 6113 Lemmon AveJun 11, 2025Replace the 1/2" rpz at the drink machine for the co2 line · 288 m away
- 3305 Manor WaySep 21, 2020Electrical repairs · 334 m away
- 6021 Cedar Springs RdMar 25, 20264x4x4 access pit in warehouse to expose vent stack and p trap in that area. install double sweep cleanouts · 338 m away
- 3500 Manor Way · Sewell CorporationSep 17, 202615,700 sq ft - 1. tear off existing roofing down to existing deck. 2. sweep deck free of gravel, dirt and debris. 3. mechanically fasten one layer of 4.3" of iso (r-25 value required by the city) to the existing deck. 4. install 1 ply white 60 mil tpo single ply roofing membrane in a fully adhered application over new insulation. *no structrual changes*building is occupied · 369 m away
- 6262 Cedar Springs RdOct 22, 2020Install new hvac · 375 m away
- 5910 Cedar Springs RdJun 22, 2026371' of 6' tall two rail fence with 3/4" pressed point pickets, steel posts set at 8', line posts are 2x2 - 16 gauge and gate posts are 15-gauge steel and power coated black - 2 manual walk gates with 1 1/2 in square heavy steel frame · 375 m away
- 5895 Cedar Springs RdAug 18, 2026Install power to cell site · 396 m away
More demolitions in 75235.