6206 Peeler St
Dallas, TX 75235
Dallas permit covers replacement of paint mix rooms
A commercial alteration permit filed October 7, 2026, covers work at 6206 Peeler St. The description calls for replacing one existing CTOF and two existing paint mix rooms; it does not identify an occupant or provide a project cost.
Summarized from City of Dallas records · updated Oct 7, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 7, 2026
- since Oct 7, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectZo bc replace 1-existing ctof with new ones.replace 2-existing paint mix rooms with new ones
Zo bc replace 1-existing ctof with new ones.replace 2-existing paint mix rooms with new ones
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 6206 Peeler St
What is being built at 6206 Peeler St in Dallas?
A City of Dallas commercial alteration permit covers replacement of one existing CTOF and two existing paint mix rooms. The record does not describe a new building.
What work is permitted at 6206 Peeler St?
Permit COM-ALT-ADD-26-002456 describes replacing one existing CTOF and two existing paint mix rooms with new ones. It was filed October 7, 2026.
When was the 6206 Peeler St permit filed?
The City of Dallas permit was filed October 7, 2026.
Is a new business opening at 6206 Peeler St?
The permit record describes equipment and paint mix room replacements, but does not identify a business or say that a new business is opening.
What is being changed near Sewell Premium Showroom?
A permit at 6206 Peeler St, about 328 meters from Sewell Premium Showroom at 3500 Manor Way, covers replacement of one existing CTOF and two paint mix rooms. It was filed October 7, 2026.
Also being built nearby
All of 75235- 3331 Haggar WayNov 4, 2026Zo bc replace existing 2 drive through paint booths with new ones.replace existing 4 paint mix rooms with new ones · 19 m away
- 6120 Peeler StJun 15, 2026Demolition and removal of approximately 4000 square feet of existing concrete slab foundation, followed by prep and replacement of new concrete slab · 66 m away
- 3333 Atwell StOct 7, 2020Install lawn sprinkler · 203 m away
- 3316 Atwell StNov 19, 2020Install fence · 214 m away
- 3202 Manor WayNov 14, 2025Someone tried to break into box - only cover was missing - no work needed to be done · 233 m away
- 3305 Manor WaySep 21, 2020Electrical repairs · 286 m away
- 6113 Lemmon AveJun 11, 2025Replace the 1/2" rpz at the drink machine for the co2 line · 306 m away
- 3500 Manor Way · Sewell CorporationSep 17, 202615,700 sq ft - 1. tear off existing roofing down to existing deck. 2. sweep deck free of gravel, dirt and debris. 3. mechanically fasten one layer of 4.3" of iso (r-25 value required by the city) to the existing deck. 4. install 1 ply white 60 mil tpo single ply roofing membrane in a fully adhered application over new insulation. *no structrual changes*building is occupied · 328 m away
- 6262 Cedar Springs RdOct 22, 2020Install new hvac · 345 m away
- 6021 Cedar Springs RdMar 25, 20264x4x4 access pit in warehouse to expose vent stack and p trap in that area. install double sweep cleanouts · 359 m away
- 6300 Cedar Springs RdApr 8, 2026Replace section of 4" sewer line · 370 m away
- 6303 Cedar Springs RdNov 16, 2026Primary and paint booth wiring · 381 m away