7850 Aviation Pl
Dallas, TX 75235
Office remodel permitted at 7850 Aviation Pl
Dallas permits indicate an interior office remodel on the third floor of the Sargent Michael Smith law enforcement building at Love Field. The remodel was permitted on August 4, 2025, and includes larger workspaces, conference rooms, offices, storage, a breakroom, and showers in existing restrooms. Later permits cover mechanical, plumbing, and electrical work at the address.
Summarized from City of Dallas records · updated Apr 28, 2026
- Projects
- 10
- 10 filings
- Latest filing
- Apr 28, 2026
- since Aug 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
10 projectsPhase 2 of current renovation. entails reconfiguration of ductwork. addition of an existing vav. relocation of existing vav
Phase 2 of current renovation. entails reconfiguration of ductwork. addition of an existing vav. relocation of existing vav
City of Dallas permitCommercial Mechanical PermitShower drain, stand up shower, domestic cold water, inwall and above ceilings, sanitary sewer drain, and vents inwall and above ceiling
Shower drain, stand up shower, domestic cold water, inwall and above ceilings, sanitary sewer drain, and vents inwall and above ceiling
City of Dallas permitCommercial Plumbing PermitQteam inhouse project is located on the 3rd floor of the sargent michael smith law enforcement building at love field airport. the interior remodel of an existing building includes new larger workspaces, shared conference rooms, offices, storage rooms, breakroom and the addition of showers to existing restrooms. new interior finishes throughout. relocation of existing electrical lights, hvac, and new data/it/av in new workspaces. remodel also includes new office furniture
Qteam inhouse project is located on the 3rd floor of the sargent michael smith law enforcement building at love field airport. the interior remodel of an existing building includes new larger workspaces, shared conference rooms, offices, storage rooms, breakroom and the addition of showers to existing restrooms. new interior finishes throughout. relocation of existing electrical lights, hvac, and new data/it/av in new workspaces. remodel also includes new office furniture
City of Dallas permitPhase - Alteration AdditionQteam inhouse project is located on the 3rd floor of the sargent michael smith law enforcement building at love field airport. the interior remodel of an existing building includes new larger workspaces, shared conference rooms, offices, storage rooms, breakroom and the addition of showers to existing restrooms. new interior finishes throughout. relocation of existing electrical lights, hvac, and new data/it/av in new workspaces. remodel also includes new office furniture
Qteam inhouse project is located on the 3rd floor of the sargent michael smith law enforcement building at love field airport. the interior remodel of an existing building includes new larger workspaces, shared conference rooms, offices, storage rooms, breakroom and the addition of showers to existing restrooms. new interior finishes throughout. relocation of existing electrical lights, hvac, and new data/it/av in new workspaces. remodel also includes new office furniture
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 7850 Aviation Pl
What is being built at 7850 Aviation Pl in Dallas?
Permits describe an interior remodel of existing office space on the third floor of the Sargent Michael Smith law enforcement building at Love Field, not a new building. The work includes larger workspaces, shared conference rooms, offices, storage, a breakroom, and showers in existing restrooms.
When was the office remodel at 7850 Aviation Pl permitted?
The City of Dallas issued a Commercial Alteration Addition Permit on August 4, 2025 (COM-ALT-ADD-25-000339). A related Phase - Alteration Addition permit was filed October 27, 2025 (COM-PH-ALT-ADD-25-000288).
Is 7850 Aviation Pl a new office building?
The permits describe renovation of an existing building, including new office layouts and interior finishes. They do not describe construction of a new office building.
What work is included in the remodel at 7850 Aviation Pl?
The permit description includes larger workspaces, shared conference rooms, offices, storage rooms, a breakroom, showers in existing restrooms, new interior finishes, and relocated electrical and HVAC systems.
What other permits have been filed at 7850 Aviation Pl?
Records include a mechanical permit filed February 23, 2026, for ductwork reconfiguration and relocation of an existing VAV, as well as plumbing permits filed in November 2025. A commercial electrical permit was filed April 28, 2026.
Also being built nearby
All of 75235- 7850 Aviation Place · City Of Dallas, Department Of AviationMar 11, 2025City of dallas love field aoc-aeoc interior remodel existing building. 3rd fl. — renovation/alteration — interior remodel of 10,000 sq ft of the 3rd fl to include new larger workspaces, conference rms, office/storage/break rms & the add. of showers to the existing restrooms. relocation of existing electrical lights/hvac/it/av & new office furniture
- 7816 Aviation PlNov 4, 2026Dallas love field parking garage c. installing a circuit for a illuminated parking garage sign. 120v 20a · 10 m away
- 7440 Aviation PlOct 28, 2026We are doing the plumbing work on a remodel of the gulfstream hanger at love field · 121 m away
- 7440 Aviation Place · Gulfstream Aerospace Services CorporationMar 20, 2024Hangar c remodel — renovation/alteration — remodel of existing paint hangar into interiors finish shops. includes remodel of existing restrooms and break rooms · 121 m away
- 7212 Herb Kelleher WayOct 3, 2025Install one (1) 10,000-gallon double-walled steel ul-2085 above ground storage tank (ast) for gasoline storage. install new 2" dia double-walled flexible underground product piping as well as electronic in-tank monitoring and spill prevention equipment. the existing fueling islands and dispensers are to remain · 190 m away
- 7020 Herb Kelleher WayApr 23, 2026Install electrical for new above ground fuel tank new fuel dispensers and fuel monitor · 271 m away
- 3377 Edwards AveOct 9, 2025Replacing (1) 5 ton rtu like for like · 438 m away