7850 Aviation Place
Dallas, TX 75235 · City Of Dallas Love Field Aoc/Aeoc Interior Remodel Existing Building 3rd Floor, City Of Dallas Love Field Aoc-Aeoc Interior Remodel Existing Bldg. 3rd Fl.
TDLR records list a third-floor remodel at Love Field
A 10,000-square-foot third-floor interior remodel is listed for the multi-tenant building at 7850 Aviation Place. The Texas Department of Licensing and Regulation records were filed March 11, 2025, and describe larger workspaces, conference rooms, offices, storage, a breakroom, bathroom showers and new finishes. One registration lists an applicant estimate of $2.5 million for the project.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 11, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Mar 11, 2025
- since Mar 11, 2025
- Largest scope
- 10,000 sf
- Estimated cost
- $2.5M
- state registration
Where this project stands
Finishing up · inspection nextCity of Dallas Love Field AOC/AEOC Interior Remodel Existing Building 3rd Floor
10,000 sq ft · $2.5M est.
- RegisteredMar 11, 2025
- Plan review
- ConstructionMay '25 – Feb '26
- Inspectednow
- Closed
Scheduled to finish Feb 2, 2026; the state inspection hasn't been filed yet.
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsInterior remodel of 10,000sqft of 3rd floor to include new larger workspaces shared conference rooms, offices, storage rooms, breakroom, and the addition of showers to the existing bathrooms. new finishes throughout — segeant micahel smith law enforcement building at love field airport
TDLR project registrationRenovation/AlterationReview Complete10,000 sq ft$2.5M est.- Project #
- TABS2025013833
- Tenant / owner
- City Of Dallas Love Field Aoc/Aeoc Interior Remodel Existing Building 3rd Floor
- Design firm
- Pro
- Contact
- Pro
Interior remodel of 10,000 sq ft of the 3rd fl to include new larger workspaces, conference rms, office/storage/break rms & the add. of showers to the existing restrooms. relocation of existing electrical lights/hvac/it/av & new office furniture. — segeant michael smith law enforcement building at love field airport
TDLR project registrationRenovation/AlterationProject Registered10,000 sq ft$2.5M est.- Project #
- TABS2025013843
- Tenant / owner
- City Of Dallas Love Field Aoc-Aeoc Interior Remodel Existing Bldg. 3rd Fl.
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 7850 Aviation Place
What is being built at 7850 Aviation Place in Dallas?
TDLR records describe a 10,000-square-foot interior remodel of the building’s third floor, including workspaces, conference rooms, offices, storage, a breakroom and bathroom showers. The records identify it as a multi-tenant building.
When was the 7850 Aviation Place remodel filed?
Two TDLR registrations were filed March 11, 2025: TABS2025013833 and TABS2025013843.
Is the project a new building or a renovation?
The TDLR registrations classify the work as a renovation or alteration of an existing building’s third floor.
How much will the 7850 Aviation Place remodel cost?
One TDLR registration lists an applicant estimate of $2.5 million. This is an estimate for the project, not a confirmed final cost.
What building is being remodeled at Love Field?
The registrations describe a third-floor remodel at the Sergeant Michael Smith Law Enforcement Building at Love Field Airport.
What is being remodeled near Gulfstream Aerospace Services Corporation?
TDLR records list a 10,000-square-foot third-floor interior remodel at 7850 Aviation Place, about 121 meters from Gulfstream Aerospace Services Corporation at 7440 Aviation Place.
Also being built nearby
All of 75235- 7850 Aviation PlApr 28, 2026Remoldoling
- 7816 Aviation PlNov 4, 2026Dallas love field parking garage c. installing a circuit for a illuminated parking garage sign. 120v 20a · 10 m away
- 7440 Aviation PlOct 28, 2026We are doing the plumbing work on a remodel of the gulfstream hanger at love field · 121 m away
- 7440 Aviation Place · Gulfstream Aerospace Services CorporationMar 20, 2024Hangar c remodel — renovation/alteration — remodel of existing paint hangar into interiors finish shops. includes remodel of existing restrooms and break rooms · 121 m away
- 7212 Herb Kelleher WayOct 3, 2025Install one (1) 10,000-gallon double-walled steel ul-2085 above ground storage tank (ast) for gasoline storage. install new 2" dia double-walled flexible underground product piping as well as electronic in-tank monitoring and spill prevention equipment. the existing fueling islands and dispensers are to remain · 190 m away
- 7020 Herb Kelleher WayApr 23, 2026Install electrical for new above ground fuel tank new fuel dispensers and fuel monitor · 271 m away
- 3377 Edwards AveOct 9, 2025Replacing (1) 5 ton rtu like for like · 438 m away