Camera system and rooftop unit work at 3377 Edwards Ave
Permits indicate a damage-detection camera system is being installed at the customer entrance and exit at 3377 Edwards Ave. A separate permit filed October 9, 2025, covers replacing one 5-ton rooftop unit like for like; the camera-system permit was filed August 4, 2025.
Summarized from City of Dallas records · updated Oct 9, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 9, 2025
- since Aug 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsInstall a damage detection camera system at both the customer exit and customer entrance. the system consists of an arch with cameras and lights to detect the presence of damage and relay the images to hertz personnel. all associated electrical and data requirements are also proposed
Install a damage detection camera system at both the customer exit and customer entrance. the system consists of an arch with cameras and lights to detect the presence of damage and relay the images to hertz personnel. all associated electrical and data requirements are also proposed
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 3377 Edwards Ave
What is being built at 3377 Edwards Ave in Dallas?
City of Dallas permits cover a camera system at the customer entrance and exit and replacement of one 5-ton rooftop unit. The records describe equipment work, not a new building.
What is the camera system at 3377 Edwards Ave for?
The August 4, 2025, permit describes an arch with cameras and lights to detect vehicle damage and relay images to Hertz personnel. The permit is COM-ELC-25-001157.
When was work permitted at 3377 Edwards Ave?
The camera-system permit was filed August 4, 2025. The permit to replace one 5-ton rooftop unit was filed October 9, 2025.
Is a new building going up at 3377 Edwards Ave?
The two City of Dallas permits listed are for a damage-detection camera system and a like-for-like rooftop-unit replacement. They do not describe construction of a new building.
What work is happening near Highland Park United Methodist Church Campus Updates?
At 3377 Edwards Ave, about 381 meters from the church campus, permits cover a camera system at the customer entrance and exit and replacement of one 5-ton rooftop unit. The filings are dated August 4 and October 9, 2025.
Also being built nearby
All of 75235- 3407 Hawes AveApr 30, 2026We are adding a standalone carport metal frame on the east side of the property 20x40 · 190 m away
- 3387 Hawes AveApr 20, 2026We are building a 20x40 freestanding covered carport · 195 m away
- 7440 Aviation PlOct 28, 2026We are doing the plumbing work on a remodel of the gulfstream hanger at love field · 321 m away
- 7440 Aviation Place · Gulfstream Aerospace Services CorporationMar 20, 2024Hangar c remodel — renovation/alteration — remodel of existing paint hangar into interiors finish shops. includes remodel of existing restrooms and break rooms · 321 m away
- 6618 Collville AveJun 2, 2026This submittal details the replacement of an existing chain-link fence with an eight-foot precast ledgestone screen wall topped with three strands of barbed wire at an existing oncor substation (parcel ids: 00000222739000000; 00000222754000000; 00000222742000000; 00000222745000000; 00000222748000000; 00000222751000000; 00000222757000000; 00000222760000000; 00000222763000000). the structure is supported by 18-inch diameter, 10-foot-deep piers with centrally embedded astm a992 grade 50 steel posts and wall panels maintaining a three (3) to six (6)-inch bottom clearance. engineered for 135 to 140 mph winds per city of dallas and asce 7-16 requirements, the design complies with aci 318-08 and the pci design manual sixth edition. materials include 5,000 psi concrete for panels and caps (4,000 psi stripping), 8,000 psi non-shrink grout, astm a615 grade 60 rebar and 60 ksi smooth welded wire mesh. hardware features 12-inch flared loop coil inserts with a 7,500-pound pull strength · 328 m away
- 7020 Herb Kelleher WayApr 23, 2026Install electrical for new above ground fuel tank new fuel dispensers and fuel monitor · 351 m away
- 3300 Mockingbird Lane · Highland Park United Methodist ChurchDec 15, 2025Highland park united methodist church campus updates — renovation/alteration — approximately 69,000 sq ft of renovations to the existing facility across three above grade floors and basement floor, inlcuding a new exterior patio with entry stairs and ramp · 381 m away
- 3300 W Mockingbird LnJun 30, 2025Install of 4 gen ii tesla wall connectors and 2 tesla dual port pedestals · 381 m away
- 3326 W Mockingbird LnOct 6, 2026Gas test / gas generator hook up to gas manifold 20’ · 383 m away
- 7212 Herb Kelleher WayOct 3, 2025Install one (1) 10,000-gallon double-walled steel ul-2085 above ground storage tank (ast) for gasoline storage. install new 2" dia double-walled flexible underground product piping as well as electronic in-tank monitoring and spill prevention equipment. the existing fueling islands and dispensers are to remain · 420 m away
- 7816 Aviation PlNov 4, 2026Dallas love field parking garage c. installing a circuit for a illuminated parking garage sign. 120v 20a · 428 m away
- 7850 Aviation PlApr 28, 2026Remoldoling · 438 m away