3300 Mockingbird Lane
Dallas, TX 75205 · Highland Park United Methodist Church Campus Updates, Highland Park Umc Production Suite Renovation
69,000 sq ft of Highland Park UMC renovations registered
A TDLR project registration filed Dec. 15, 2025, describes about 69,000 square feet of renovations to Highland Park United Methodist Church’s existing facility at 3300 Mockingbird Lane. The work includes renovations across three above-grade floors and a basement, plus an exterior patio with entry stairs and a ramp. The applicant’s estimated project cost is $18 million.
Summarized from Texas Department of Licensing and Regulation records · updated Dec 15, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Dec 15, 2025
- since Dec 15, 2025
- Largest scope
- 69,000 sf
- Estimated cost
- $18M
- state registration
Where this project stands
Under constructionHIGHLAND PARK UNITED METHODIST CHURCH CAMPUS UPDATES
69,000 sq ft · $18M est.
- RegisteredDec 15, 2025
- Plan review
- ConstructionApr '26 – Dec '27
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
2 projectsApproximately 69,000 sq ft of renovations to the existing facility across three above grade floors and basement floor, inlcuding a new exterior patio with entry stairs and ramp. — highland park united methodist church
TDLR project registrationRenovation/AlterationReview Complete69,000 sq ft$18M est.- Project #
- TABS2026007982
- Tenant / owner
- Highland Park United Methodist Church Campus Updates
- Design firm
- Pro
- Contact
- Pro
Conversion from green room to audio visual production room (employee work area). — highland park united methodist church
TDLR project registrationRenovation/AlterationProject Closed700 sq ft$100K est.- Project #
- TABS2024003814
- Tenant / owner
- Highland Park Umc Production Suite Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 3300 Mockingbird Lane
What is being built at 3300 Mockingbird Lane?
A TDLR registration describes renovations to Highland Park United Methodist Church’s existing facility, including an exterior patio with entry stairs and a ramp. The registration was filed Dec. 15, 2025.
Is Highland Park United Methodist Church getting a new building?
The filing describes renovations to the existing facility, not a new building. The work covers three above-grade floors and a basement.
How large are the church renovations at 3300 Mockingbird Lane?
The TDLR registration lists approximately 69,000 square feet of renovations. It is project TABS2026007982, filed Dec. 15, 2025.
How much will the Highland Park UMC campus renovations cost?
The applicant’s estimated cost for the project is $18 million. This is an estimate listed in the TDLR registration, not a reported final cost.
What is being renovated near Sewell Premium Showroom?
The nearby project at 3300 Mockingbird Lane is a renovation of Highland Park United Methodist Church’s existing facility. Its TDLR registration describes about 69,000 square feet of work.
What construction is planned near Pegasus Bank on Mockingbird Lane?
A TDLR filing for Highland Park United Methodist Church describes renovations across three above-grade floors and a basement, as well as a new exterior patio. The filing date is Dec. 15, 2025.
Also being built nearby
All of 75205- 3300 W Mockingbird LnJun 30, 2025Install of 4 gen ii tesla wall connectors and 2 tesla dual port pedestals
- 3326 W Mockingbird LnOct 6, 2026Gas test / gas generator hook up to gas manifold 20’ · 13 m away
- 6618 Collville AveJun 2, 2026This submittal details the replacement of an existing chain-link fence with an eight-foot precast ledgestone screen wall topped with three strands of barbed wire at an existing oncor substation (parcel ids: 00000222739000000; 00000222754000000; 00000222742000000; 00000222745000000; 00000222748000000; 00000222751000000; 00000222757000000; 00000222760000000; 00000222763000000). the structure is supported by 18-inch diameter, 10-foot-deep piers with centrally embedded astm a992 grade 50 steel posts and wall panels maintaining a three (3) to six (6)-inch bottom clearance. engineered for 135 to 140 mph winds per city of dallas and asce 7-16 requirements, the design complies with aci 318-08 and the pci design manual sixth edition. materials include 5,000 psi concrete for panels and caps (4,000 psi stripping), 8,000 psi non-shrink grout, astm a615 grade 60 rebar and 60 ksi smooth welded wire mesh. hardware features 12-inch flared loop coil inserts with a 7,500-pound pull strength · 69 m away
- 3407 Hawes AveApr 30, 2026We are adding a standalone carport metal frame on the east side of the property 20x40 · 209 m away
- 3387 Hawes AveApr 20, 2026We are building a 20x40 freestanding covered carport · 216 m away
- 3689 W Mockingbird LnFeb 18, 2026This is an electrical service for the traffic signal at airdrome-mockingbird and the newly added streetlights on mockingbird.it is located on the island on the north side of mockingbird at the intersection of airdrome · 230 m away
- 3230 W Mockingbird LnAug 13, 2024In house - quiktrip 936 - coffee wow phase 2.5 - updated millwork and equipment to existing coffee bar, install new drain manifold to serve the coffee bar, added dedicated waterline and circuit for coffeewow autoclean system, add glycol chiller and nitrogen generator for nitro coffee · 278 m away
- 3500 Manor Way · Sewell CorporationSep 17, 202615,700 sq ft - 1. tear off existing roofing down to existing deck. 2. sweep deck free of gravel, dirt and debris. 3. mechanically fasten one layer of 4.3" of iso (r-25 value required by the city) to the existing deck. 4. install 1 ply white 60 mil tpo single ply roofing membrane in a fully adhered application over new insulation. *no structrual changes*building is occupied · 358 m away
- 3130 W Mockingbird LnOct 6, 2020Electrical repairs · 364 m away
- 3377 Edwards AveOct 9, 2025Replacing (1) 5 ton rtu like for like · 381 m away
- 6445 Lemmon Ave · The Coca Cola CompanyNov 12, 2026Tccc dallas syrup facility locker rooms — renovation/alteration — 1809 sq ft interior renovation of men's and women's locker room · 388 m away
- 6445 Lemmon AveNov 13, 2026Bu zo 1,809 sq ft interior renovation of men's and women's locker room. replace plumbing fixtures and wall/floor/ceiling finish · 388 m away