3300 W Mockingbird Ln
Dallas, TX 75235
Permit covers Tesla chargers at 3300 W Mockingbird Ln
A City of Dallas electrical permit indicates installation of four Gen II Tesla Wall Connectors and two Tesla dual-port pedestals at 3300 W Mockingbird Ln. The permit was filed June 30, 2025, under permit number COM-ELC-25-000618.
Summarized from City of Dallas records · updated Jun 30, 2025
- Projects
- 5
- 5 filings
- Latest filing
- Jun 30, 2025
- since Jan 7, 2021
- Largest scope
- —
- Listed value
- $125
- partial · often understated
Permit & project history
5 projectsSources: City of Dallas
Questions about 3300 W Mockingbird Ln
What is being installed at 3300 W Mockingbird Ln?
A City of Dallas permit covers four Gen II Tesla Wall Connectors and two Tesla dual-port pedestals. It was filed June 30, 2025.
When was the Tesla charger permit filed at 3300 W Mockingbird Ln?
The electrical permit was filed June 30, 2025. Its number is COM-ELC-25-000618.
Is a Tesla charging station being built near Highland Park United Methodist Church?
A City of Dallas permit for 3300 W Mockingbird Ln indicates installation of four Tesla Wall Connectors and two dual-port pedestals. The nearby landmark listing places Highland Park United Methodist Church Campus Updates at the same address.
How many Tesla chargers are planned for 3300 W Mockingbird Ln?
The permit lists four Gen II Tesla Wall Connectors and two Tesla dual-port pedestals. It does not provide a completion date.
What does Dallas permit COM-ELC-25-000618 cover?
The City of Dallas commercial electrical permit covers installation of four Gen II Tesla Wall Connectors and two Tesla dual-port pedestals at 3300 W Mockingbird Ln. It was filed June 30, 2025.
Also being built nearby
All of 75235- 3300 Mockingbird Lane · Highland Park United Methodist ChurchDec 15, 2025Highland park united methodist church campus updates — renovation/alteration — approximately 69,000 sq ft of renovations to the existing facility across three above grade floors and basement floor, inlcuding a new exterior patio with entry stairs and ramp
- 3326 W Mockingbird LnOct 6, 2026Gas test / gas generator hook up to gas manifold 20’ · 13 m away
- 6618 Collville AveJun 2, 2026This submittal details the replacement of an existing chain-link fence with an eight-foot precast ledgestone screen wall topped with three strands of barbed wire at an existing oncor substation (parcel ids: 00000222739000000; 00000222754000000; 00000222742000000; 00000222745000000; 00000222748000000; 00000222751000000; 00000222757000000; 00000222760000000; 00000222763000000). the structure is supported by 18-inch diameter, 10-foot-deep piers with centrally embedded astm a992 grade 50 steel posts and wall panels maintaining a three (3) to six (6)-inch bottom clearance. engineered for 135 to 140 mph winds per city of dallas and asce 7-16 requirements, the design complies with aci 318-08 and the pci design manual sixth edition. materials include 5,000 psi concrete for panels and caps (4,000 psi stripping), 8,000 psi non-shrink grout, astm a615 grade 60 rebar and 60 ksi smooth welded wire mesh. hardware features 12-inch flared loop coil inserts with a 7,500-pound pull strength · 69 m away
- 3407 Hawes AveApr 30, 2026We are adding a standalone carport metal frame on the east side of the property 20x40 · 209 m away
- 3387 Hawes AveApr 20, 2026We are building a 20x40 freestanding covered carport · 216 m away
- 3689 W Mockingbird LnFeb 18, 2026This is an electrical service for the traffic signal at airdrome-mockingbird and the newly added streetlights on mockingbird.it is located on the island on the north side of mockingbird at the intersection of airdrome · 230 m away
- 3230 W Mockingbird LnAug 13, 2024In house - quiktrip 936 - coffee wow phase 2.5 - updated millwork and equipment to existing coffee bar, install new drain manifold to serve the coffee bar, added dedicated waterline and circuit for coffeewow autoclean system, add glycol chiller and nitrogen generator for nitro coffee · 278 m away
- 3500 Manor Way · Sewell CorporationSep 17, 202615,700 sq ft - 1. tear off existing roofing down to existing deck. 2. sweep deck free of gravel, dirt and debris. 3. mechanically fasten one layer of 4.3" of iso (r-25 value required by the city) to the existing deck. 4. install 1 ply white 60 mil tpo single ply roofing membrane in a fully adhered application over new insulation. *no structrual changes*building is occupied · 358 m away
- 3130 W Mockingbird LnOct 6, 2020Electrical repairs · 364 m away
- 3377 Edwards AveOct 9, 2025Replacing (1) 5 ton rtu like for like · 381 m away
- 6445 Lemmon Ave · The Coca Cola CompanyNov 12, 2026Tccc dallas syrup facility locker rooms — renovation/alteration — 1809 sq ft interior renovation of men's and women's locker room · 388 m away
- 6445 Lemmon AveNov 13, 2026Bu zo 1,809 sq ft interior renovation of men's and women's locker room. replace plumbing fixtures and wall/floor/ceiling finish · 388 m away