10615 Sanden Rd
Dallas, TX 75238 · B Sanden Drive Owner LP
Maverick Power office remodel registered in Dallas warehouse
A second-generation office remodel within a warehouse building is planned at 10615 Sanden Road for Maverick Power. The Texas Department of Licensing and Regulation project registration was filed October 6, 2026, and lists 517,575 square feet. The applicant’s estimated project cost is $3,955,175.
Summarized from Texas Department of Licensing and Regulation records · updated Oct 6, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 6, 2026
- since Oct 6, 2026
- Largest scope
- 517,575 sf
- Estimated cost
- $4.0M
- state registration
Where this project stands
In state plan reviewMaverick Power
517,575 sq ft · $4.0M est.
- RegisteredOct 6, 2026
- Plan reviewnow
- ConstructionOct '26 – Apr '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectSecond generation office remodel within warehouse building. — 10615 sanden
TDLR project registrationRenovation/AlterationProject Registered517,575 sq ft$4.0M est.- Project #
- TABS2027002838
- Tenant / owner
- Maverick Power
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 10615 Sanden Rd
What is being built at 10615 Sanden Road?
The project registration describes a second-generation office remodel within a warehouse building for Maverick Power. It lists 517,575 square feet.
When was the Maverick Power project registered?
The Texas Department of Licensing and Regulation registration was filed October 6, 2026. Its project number is TABS2027002838.
How much will the 10615 Sanden Road project cost?
The applicant’s estimated cost for the project is $3,955,175, according to the TDLR registration filed October 6, 2026.
Is Maverick Power opening a new office in Dallas?
The registration indicates an office remodel within an existing warehouse building at 10615 Sanden Road. It does not state when the remodel will be complete or whether this is a new office location.
What is being built near Anderson Windows Remodel Garland - Phase 2?
About 377 meters from that project, Maverick Power’s registration describes a second-generation office remodel within a warehouse building at 10615 Sanden Road. The filing date is October 6, 2026.
What is being built near Idi Miller Road - B1a - Spec Suite?
The Maverick Power project at 10615 Sanden Road is a registered office remodel within a warehouse building. It is about 469 meters from Idi Miller Road - B1a - Spec Suite.
Also being built nearby
All of 75238- 10615 Sanden DrOct 21, 2026Zo bc construct approx. 575lf of new walls to expand and remodel existing office pods. install r19 insulation from 10' aff to deck throughout warehouse. ac warehouse, new lighting throughout warehouse, provide power for equipment, roof in new hvac units
- 10665 Sanden DrDec 31, 2020Interior remodel only · 149 m away
- 10710 Sanden DrOct 24, 2025Replace a 1-1/2" rpz inside “ · 309 m away
- 11011 Regency Crest DrApr 15, 2026Mcr installing a pallet racking and shelving system · 368 m away
- 3801 Regency Crest Drive · Cpf Gateway Industrial II LLCNov 24, 2025Anderson windows remodel garland - phase 2 — renovation/alteration — new restroom renovation, loading dock and relocation of 2 idf rooms · 377 m away
- 10755 Sanden DrJul 17, 2025Panel upgrade · 435 m away
- 10865 Miller RdOct 27, 2026Qteam inhouse electrical upgrade for suite 200 · 451 m away
- 10855 Miller RdNov 16, 2026Building 1b spec - sewer/water/gas for interior spec office · 464 m away
- 10851 Miller RdNov 13, 2026Qteam inhouse first time finish out for spec office · 469 m away
- 10851 Miller Road · Idil Miller 365, LPNov 4, 2026Idi miller road - b1a - spec suite — new construction — new construction of a first generation spec office suite and remote unisex restroom within a existing warehouse. 3,742 sq ft · 469 m away
- 10775 Sanden DrJun 10, 2026Gas test and repair leak on roof · 492 m away
- 10440 Plano RdOct 26, 2026Install (2) split systems · 554 m away