9810 Church Cir
Dallas, TX 75238
40-gallon gas water heater replacement at 9810 Church Cir
A residential plumbing permit covers replacing one 40-gallon gas water heater in the garage at 9810 Church Cir. The City of Dallas permit is dated March 20, 2026.
Summarized from City of Dallas records · updated Mar 20, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Mar 20, 2026
- since Mar 20, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9810 Church Cir
What is happening at 9810 Church Cir, Dallas?
A City of Dallas residential plumbing permit covers a change-out of one 40-gallon gas water heater in the garage. The permit is dated March 20, 2026.
Is a new building being built at 9810 Church Cir?
The permit record is for replacing a gas water heater, not for a new building. It is listed as a residential plumbing permit.
What does permit RES-PLM-26-003053 cover?
Permit RES-PLM-26-003053 covers installation of one 40-gallon gas water heater in the garage as a change-out. It is dated March 20, 2026.
When was the water heater permit filed at 9810 Church Cir?
The City of Dallas permit record is dated March 20, 2026.
What is happening near Calvary Lutheran Church on Church Cir?
At 9810 Church Cir, about 13 meters from Calvary Lutheran Church at 9807 Church Road, a permit covers replacing one 40-gallon gas water heater in a garage. The permit is dated March 20, 2026.
Also being built nearby
All of 75238- 9815 Church CirSep 1, 20264 ton basic gas system- front downstairs system · 13 m away
- 9807 Church Road · Calvary Lutheran ChurchDec 23, 2025Calvary lutheran church parking expansion — renovation/alteration — demolition and expansion of an existing parking lot · 13 m away
- 9807 Church RdApr 23, 2026Parking lot lighting upgrade:replace heads on existing polesrelocate 4 polesadd outlet at retaining wall · 13 m away
- 9815 Windledge DrJul 30, 2026Main sewer replacement in crawl space · 106 m away
- 9839 Windledge DrMar 2, 2022Conversion of garage to living space.addition of attached garage (433 sq ft).remodel of second floor master bedroom and bathroom (adding 103 sq ft) · 110 m away
- 9809 Windledge DrMar 10, 2026Full under pier & beam sewer pipe replacementexcavation to, re-route / replace (front middlebathroom, half middle bathroom, back middle bathroom, kitchen &washer line under home sewer pipes only) of the plumbing sewerdrainpipe under the home only. our plan reroutes the under-slab/home sewer pipe and connects it back into the yard sewer line at thecity tap area , effectively replacing the yard sewer line as well · 111 m away
- 10105 Clearmeadow DrOct 11, 2020Foundation repair · 114 m away
- 9794 Church RdFeb 3, 2026Electrical service for traffic signal · 116 m away
- 10123 Clearmeadow DrOct 23, 2025Test line gas 18 in water / gas trench per 10 ft · 118 m away
- 10129 Clearmeadow DrDec 10, 2020Remodel · 119 m away
- 10110 Clearmeadow DrNov 13, 2026Remove old composition shingles & install new composition shingles · 127 m away
- 10016 Clearmeadow DrNov 17, 20257 total piers2 block and padsreset and shim · 136 m away