9794 Church Rd
Dallas, TX 75238
Traffic signal electrical service permitted at 9794 Church Rd
A commercial electrical permit covers electrical service for a traffic signal at 9794 Church Rd. The City of Dallas record was filed February 3, 2026, under permit COM-ELC-26-000413.
Summarized from City of Dallas records · updated Feb 3, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Feb 3, 2026
- since Feb 3, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9794 Church Rd
What is being built at 9794 Church Rd in Dallas?
A City of Dallas permit describes electrical service for a traffic signal. It does not specify whether a new signal is being installed.
When was the traffic signal permit filed at 9794 Church Rd?
The permit was filed February 3, 2026. Its number is COM-ELC-26-000413.
Is a new traffic signal being installed at 9794 Church Rd?
The permit description says “Electrical service for traffic signal.” It does not confirm that the signal itself is new.
What is happening near Calvary Lutheran Church Parking Expansion on Church Road?
A commercial electrical permit was filed at 9794 Church Rd for electrical service for a traffic signal. The nearby parking expansion is at 9807 Church Road.
Who filed the permit for 9794 Church Rd?
The available record is from the City of Dallas and does not name an owner or permit applicant.
Also being built nearby
All of 75238- 9815 Church CirSep 1, 20264 ton basic gas system- front downstairs system · 104 m away
- 9807 Church Road · Calvary Lutheran ChurchDec 23, 2025Calvary lutheran church parking expansion — renovation/alteration — demolition and expansion of an existing parking lot · 105 m away
- 9807 Church RdApr 23, 2026Parking lot lighting upgrade:replace heads on existing polesrelocate 4 polesadd outlet at retaining wall · 105 m away
- 9810 Church CirMar 20, 2026Install (1) 40 gal gas water heater in garage (change out) · 116 m away
- 10059 Ravensway DrJul 15, 2026Dsst risd- northlake es full turnkey installation of a steel and fabric shade structure with reenforced concrete foundations · 135 m away
- 9809 Windledge DrMar 10, 2026Full under pier & beam sewer pipe replacementexcavation to, re-route / replace (front middlebathroom, half middle bathroom, back middle bathroom, kitchen &washer line under home sewer pipes only) of the plumbing sewerdrainpipe under the home only. our plan reroutes the under-slab/home sewer pipe and connects it back into the yard sewer line at thecity tap area , effectively replacing the yard sewer line as well · 147 m away
- 9815 Windledge DrJul 30, 2026Main sewer replacement in crawl space · 151 m away
- 9740 Windledge DrMay 13, 2026186 linear footage 8ft board on board cedar fence · 172 m away
- 9734 Windledge DrDec 31, 20259 trenching (under sidewalk), 18.4 lf french drain-4 pvc, 27lf french drain discharge line, 1.1 lf surface drain discharge line · 177 m away
- 9728 Windledge DrAug 3, 2026Replace gas line from meter to house · 183 m away
- 9816 Tanglevine DrJun 23, 20263 ton base upflow gas system · 189 m away
- 10129 Clearmeadow DrDec 10, 2020Remodel · 199 m away