9815 Church Cir
Dallas, TX 75238
Permit filed for a 4-ton gas system at a Dallas home
A residential mechanical permit covers a 4-ton gas system for the front downstairs area at 9815 Church Cir. The City of Dallas permit was filed September 1, 2026.
Summarized from City of Dallas records · updated Sep 1, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 1, 2026
- since Sep 1, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 9815 Church Cir
What is being built at 9815 Church Cir?
A City of Dallas residential mechanical permit describes a 4-ton gas system for the front downstairs area. It does not indicate a new building.
What kind of system is planned for 9815 Church Cir?
The permit description says “4 ton basic gas system” for the front downstairs area.
When was the permit filed for 9815 Church Cir?
The City of Dallas filed the permit on September 1, 2026. The permit number is RES-MEC-26-004815.
Is a new home being built at 9815 Church Cir?
The record is for a residential mechanical permit describing a gas system, not a new-home construction permit.
What work is permitted near Calvary Lutheran Church Parking Expansion?
At 9815 Church Cir, about 4 meters from the parking expansion site, a residential mechanical permit covers a 4-ton gas system for the front downstairs area. It was filed September 1, 2026.
Also being built nearby
All of 75238- 9807 Church Road · Calvary Lutheran ChurchDec 23, 2025Calvary lutheran church parking expansion — renovation/alteration — demolition and expansion of an existing parking lot · 4 m away
- 9807 Church RdApr 23, 2026Parking lot lighting upgrade:replace heads on existing polesrelocate 4 polesadd outlet at retaining wall · 4 m away
- 9810 Church CirMar 20, 2026Install (1) 40 gal gas water heater in garage (change out) · 13 m away
- 9794 Church RdFeb 3, 2026Electrical service for traffic signal · 104 m away
- 9815 Windledge DrJul 30, 2026Main sewer replacement in crawl space · 104 m away
- 9809 Windledge DrMar 10, 2026Full under pier & beam sewer pipe replacementexcavation to, re-route / replace (front middlebathroom, half middle bathroom, back middle bathroom, kitchen &washer line under home sewer pipes only) of the plumbing sewerdrainpipe under the home only. our plan reroutes the under-slab/home sewer pipe and connects it back into the yard sewer line at thecity tap area , effectively replacing the yard sewer line as well · 108 m away
- 9839 Windledge DrMar 2, 2022Conversion of garage to living space.addition of attached garage (433 sq ft).remodel of second floor master bedroom and bathroom (adding 103 sq ft) · 122 m away
- 10105 Clearmeadow DrOct 11, 2020Foundation repair · 123 m away
- 10123 Clearmeadow DrOct 23, 2025Test line gas 18 in water / gas trench per 10 ft · 126 m away
- 10129 Clearmeadow DrDec 10, 2020Remodel · 127 m away
- 10110 Clearmeadow DrNov 13, 2026Remove old composition shingles & install new composition shingles · 136 m away
- 10016 Clearmeadow DrNov 17, 20257 total piers2 block and padsreset and shim · 148 m away