13615 N Central Expy
Dallas, TX 75240
Gas-detection controls permitted at 13615 N Central Expy
An electrical permit filed Aug. 14, 2026, covers installation of gas-detection controls for exhaust and make-up-air ventilation at 13615 N Central Expy. The permit description says the controls are not connected to a fire alarm; it does not specify other project details.
Summarized from City of Dallas records · updated Aug 14, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Aug 14, 2026
- since Aug 14, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectElectrical installation of co/no? gas detection controls for exhaust and make-up air ventilation. not connected to fire alarm
Electrical installation of co/no? gas detection controls for exhaust and make-up air ventilation. not connected to fire alarm
City of Dallas permitCommercial Electrical Permit
Sources: City of Dallas
Questions about 13615 N Central Expy
What is being built at 13615 N Central Expy in Dallas?
A City of Dallas electrical permit covers installation of gas-detection controls for exhaust and make-up-air ventilation. The filing does not describe a broader construction project.
When was the electrical work at 13615 N Central Expy permitted?
The permit was filed Aug. 14, 2026. Its number is COM-ELC-26-003790.
What does permit COM-ELC-26-003790 cover?
It covers electrical installation of gas-detection controls for exhaust and make-up-air ventilation at 13615 N Central Expy.
Are the gas-detection controls connected to a fire alarm?
No. The permit description says the controls are not connected to a fire alarm.
What’s being built near Kilby East Remodel on N Central Expy?
At 13615 N Central Expy, about 142 meters from Kilby East Remodel at 13560 N Central Expy, a permit covers gas-detection controls for exhaust and make-up-air ventilation. The two addresses have separate permit records.
Is a new building planned at 13615 N Central Expy?
The available record is for a commercial electrical permit covering gas-detection controls. It does not specify whether a new building is planned.
Also being built nearby
All of 75240- 13651 N Central ExpyDec 18, 2020Upgrade adding 3 antennas 1 cable and 2 cabinets · 52 m away
- 13570 N Central Expy · Texas InstrumentsFeb 16, 2024Tx instruments kilby west renovation — renovation/alteration — interior renovation of an existing mixed use building · 138 m away
- 13560 N. Central Expy · Texas Instruments Inc.Oct 15, 2026Kilby east remodel — renovation/alteration — build 10x10 enclosed team room, 10x10 enclosed office, add open conference area, 520 sq ft total · 142 m away
- 13544 N. Central Expwy · Texas InstrumentsDec 20, 2024Drs v100 lab — renovation/alteration — remodel ~660 sq ft to construct clean lab space · 153 m away
- 13536 N Central Expy · Texas Instruments South BuildingApr 17, 2026South building installing medium voltage feeder into j-boxinstalling medium voltage feeder from j-boxes to substation transformersterminating feeders from switchgear to distribution panels that were installed under previous permit · 161 m away
- 13536 N Central ExpyNov 18, 2020Interior remodel only · 161 m away
- 13510 N Central ExpyOct 22, 2020Replace 3'' rpz in metal dumpster area · 195 m away
- 13345 N Central ExpyJun 20, 2025My power was disconnected due to out town.need to reconnect · 369 m away
- 13345 N Central ExpyOct 30, 2020Service release no work · 369 m away
- 13339 N Central ExpyNov 10, 2026Meter release no work done · 377 m away
- 13512 Esperanza RdOct 24, 2025Lumina apartments- building. 28- foundation repair- installing 15 ext. pilings & 4 int. pilings · 378 m away
- 13450 Esperanza RdNov 18, 2026Scope of workrefurbish forty-two (42) apartment units in building 18 consisting of:1. relocating existing electrical panels from clothes closet at each unit.(total of forty-two (42) )2. re-establish existing aluminum wiring connections at switches, receptacles, and lighting outlets using approved alumiconn connectors to provide code-compliant electrical connections.3. install new switches, receptacles, and device plates throughout forty-two (42) apartment units.a. (546) 15a 120v receptaclesb. (129) 20a gfi receptaclesc. (390) 15a single pole switchesd. (6) 30a 240v dryer receptaclee. (42) 50a 240v range receptacle · 381 m away