13570 N Central Expy
Dallas, TX 75243 · Texas Instruments
Texas Instruments Kilby West interior renovation in Dallas
A 505,000-square-foot interior renovation of an existing mixed-use building is planned at 13570 N Central Expy. The project was registered with the Texas Department of Licensing and Regulation on February 16, 2024; the applicant estimated its cost at $119 million.
Summarized from Texas Department of Licensing and Regulation records · updated Feb 16, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 16, 2024
- since Feb 16, 2024
- Largest scope
- 505,000 sf
- Estimated cost
- $119M
- state registration
Where this project stands
In state plan reviewTX Instruments Kilby West Renovation
505,000 sq ft · $119M est.
- RegisteredFeb 16, 2024
- Plan reviewnow
- ConstructionJul '24 – Jan '27
- Inspected
- Closed
Design is filed with the state. Subcontractors and suppliers are usually picked around now.
4 contacts on this project · 3 phone numbers
Permit & project history
1 projectInterior renovation of an existing mixed use building. — texas instruments kilby west
TDLR project registrationRenovation/AlterationProject Registered505,000 sq ft$119M est.- Project #
- TABS2024011758
- Tenant / owner
- TX Instruments Kilby West Renovation
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 13570 N Central Expy
What is being built at 13570 N Central Expy in Dallas?
The TDLR registration describes an interior renovation of an existing mixed-use building, named TX Instruments Kilby West Renovation. It lists 505,000 square feet.
When was the Texas Instruments Kilby West renovation registered?
The project was registered on February 16, 2024, under TDLR project number TABS2024011758.
How much will the Kilby West renovation cost?
The applicant's estimated cost for the project is $119 million. This is an estimate, not a reported final cost.
Is the project new construction or a renovation?
The TDLR record classifies it as a renovation or alteration and describes interior work in an existing mixed-use building.
Is the renovation near Texas Instruments?
Yes. The project address is about 21 meters from the Texas Instruments location at 13560 N. Central Expy.
How large is the TX Instruments Kilby West project?
The TDLR registration lists the project at 505,000 square feet.
Also being built nearby
All of 75243- 13560 N. Central Expy · Texas Instruments Inc.Oct 15, 2026Kilby east remodel — renovation/alteration — build 10x10 enclosed team room, 10x10 enclosed office, add open conference area, 520 sq ft total · 21 m away
- 13544 N. Central Expwy · Texas InstrumentsDec 20, 2024Drs v100 lab — renovation/alteration — remodel ~660 sq ft to construct clean lab space · 53 m away
- 13536 N Central Expy · Texas Instruments South BuildingApr 17, 2026South building installing medium voltage feeder into j-boxinstalling medium voltage feeder from j-boxes to substation transformersterminating feeders from switchgear to distribution panels that were installed under previous permit · 70 m away
- 13536 N Central ExpyNov 18, 2020Interior remodel only · 70 m away
- 13510 N Central ExpyOct 22, 2020Replace 3'' rpz in metal dumpster area · 123 m away
- 13615 N Central ExpyAug 14, 2026Electrical installation of co/no? gas detection controls for exhaust and make-up air ventilation. not connected to fire alarm · 138 m away
- 13651 N Central ExpyDec 18, 2020Upgrade adding 3 antennas 1 cable and 2 cabinets · 152 m away
- 13345 N Central ExpyJun 20, 2025My power was disconnected due to out town.need to reconnect · 371 m away
- 13345 N Central ExpyOct 30, 2020Service release no work · 371 m away
- 13339 N Central ExpyNov 10, 2026Meter release no work done · 380 m away
- 13333 N Central ExpyOct 10, 2026Plumbing remodel, gas for roof top unitas · 388 m away
- 13450 Esperanza RdNov 18, 2026Scope of workrefurbish forty-two (42) apartment units in building 18 consisting of:1. relocating existing electrical panels from clothes closet at each unit.(total of forty-two (42) )2. re-establish existing aluminum wiring connections at switches, receptacles, and lighting outlets using approved alumiconn connectors to provide code-compliant electrical connections.3. install new switches, receptacles, and device plates throughout forty-two (42) apartment units.a. (546) 15a 120v receptaclesb. (129) 20a gfi receptaclesc. (390) 15a single pole switchesd. (6) 30a 240v dryer receptaclee. (42) 50a 240v range receptacle · 474 m away