7 Twin Bridge
Dallas, TX 75243
Roof replacement and meter riser work at 7 Twin Bridge
Permits at 7 Twin Bridge indicate a roof replacement and plumbing work, rather than a new building. A permit filed December 3, 2020, covers removing the existing roof and installing a new one; a June 23, 2025, permit covers replacing a riser at the meter.
Summarized from City of Dallas records · updated Jun 23, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Jun 23, 2025
- since Dec 3, 2020
- Largest scope
- —
- Listed value
- $1
- partial · often understated
Permit & project history
2 projectsSources: City of Dallas
Questions about 7 Twin Bridge
What is being built at 7 Twin Bridge in Dallas?
The available permits describe maintenance work, not a new building: roof replacement and a riser replacement at the meter.
What work was permitted at 7 Twin Bridge?
A December 3, 2020, permit covers removing the existing roof and installing a new one. A June 23, 2025, residential plumbing permit covers replacing a riser at the meter.
When was the roof replacement at 7 Twin Bridge permitted?
The City of Dallas record was filed December 3, 2020, under permit 2012036001.
Was plumbing work permitted at 7 Twin Bridge?
Yes. The City of Dallas filed residential plumbing permit RES-PLM-25-001716 on June 23, 2025, for a riser replacement at the meter.
Is a new building planned at 7 Twin Bridge?
The available records do not identify a new building. They describe roof replacement and plumbing work.
Also being built nearby
All of 75243- 9016 Stone Creek PlAug 17, 2026Replace and old, failing wood railroad tie wall. new milsap stone wall to be constructed in its place, same height, length and location or original. wall is approx 626 sft and 164 lnft. variable height from 2' to 5' max · 51 m away
- 9525 Greenville AveSep 18, 2026Spot repairs on storm drains · 61 m away
- 9111 Stone Creek PlJan 8, 2026Hvac changeout/alteration: remove existing equipment and install new variable-speed ac condenser · 123 m away
- 2 Twin BridgeJan 26, 2021Remove existing roof and install new roof · 125 m away
- 9036 Stone Creek PlJun 30, 2025Replace 4 ton complete · 127 m away
- 9639 Greenville AveSep 14, 2026Zo bc this is my fourth attempt at this process. i have a client who owns an office building they currently occupy. they have brought in a new tenant for the building and are looking to add a suite 100 and suite 150 certificate of occupancy. the property is already set up for multiple tenants and no construction is necessary. at the request of the city, we had a scaled plan created showing suite 100, suite 150, and the common areas. please let me know what i need to get this taken care of, as this has gone on for a couple of months and the client is getting increasingly annoyed with the process. i am going to select alternation as part of the work, but there is no work necessary to the building. it is ready to go · 132 m away
- 9040 Stone Creek PlFeb 4, 2026Foundation repair · 146 m away
- 9622 Greenville AveJul 17, 2026Installing 50 gallon electric water heater in closet · 160 m away
- 9003 Woodhurst DrSep 15, 2026Pool perimeter is 106'will be raising the depth of pool at the deepest end from 8' to 5', raising existing spa to 18", adding a tanning ledge at one end of pool and steps at the other end. overlay 417 sq ft of existing deck, installing new tile and coping, pouring 318 sq ft of new deck, and new plaster · 160 m away
- 10 Twin BridgeApr 13, 2026Replacing 2 ton gas complete system · 168 m away
- 8 Twin BridgeMar 30, 2026(2) 50 gal gas water heaters · 172 m away
- 9007 Woodhurst DrJun 10, 2026Additional · 178 m away