9525 Greenville Ave
Dallas, TX 75243
Storm drain and sewer-line repairs at 9525 Greenville Ave
City of Dallas permits indicate repairs to the building’s main sewer line and storm drains at 9525 Greenville Ave. The sewer-line permit was filed September 4, 2025, and the storm-drain permit was filed September 18, 2026.
Summarized from City of Dallas records · updated Sep 18, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Sep 18, 2026
- since Sep 4, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 9525 Greenville Ave
What is being built at 9525 Greenville Ave in Dallas?
The records show plumbing repairs, not a new building: a repair to the building’s main sewer line and spot repairs to storm drains.
What work was permitted at 9525 Greenville Ave?
A September 4, 2025, permit (COM-PLM-25-001594) covers repair of the main sewer line where it exits the building. A September 18, 2026, permit (COM-PLM-26-003704) covers spot repairs on storm drains.
Is a new building planned at 9525 Greenville Ave?
The available City of Dallas records describe sewer-line and storm-drain repairs. They do not identify a new building project.
When were permits filed for work at 9525 Greenville Ave?
The sewer-line repair permit was filed September 4, 2025. The storm-drain repair permit was filed September 18, 2026.
What does permit COM-PLM-26-003704 cover?
The City of Dallas permit filed September 18, 2026, describes spot repairs on storm drains at 9525 Greenville Ave.
What does permit COM-PLM-25-001594 cover?
The City of Dallas permit filed September 4, 2025, covers repair of the building’s main sewer line where it exits the building.
Also being built nearby
All of 75243- 7 Twin BridgeJun 23, 2025Riser replaced at meter · 61 m away
- 9016 Stone Creek PlAug 17, 2026Replace and old, failing wood railroad tie wall. new milsap stone wall to be constructed in its place, same height, length and location or original. wall is approx 626 sft and 164 lnft. variable height from 2' to 5' max · 112 m away
- 9003 Woodhurst DrSep 15, 2026Pool perimeter is 106'will be raising the depth of pool at the deepest end from 8' to 5', raising existing spa to 18", adding a tanning ledge at one end of pool and steps at the other end. overlay 417 sq ft of existing deck, installing new tile and coping, pouring 318 sq ft of new deck, and new plaster · 162 m away
- 2 Twin BridgeJan 26, 2021Remove existing roof and install new roof · 165 m away
- 9639 Greenville AveSep 14, 2026Zo bc this is my fourth attempt at this process. i have a client who owns an office building they currently occupy. they have brought in a new tenant for the building and are looking to add a suite 100 and suite 150 certificate of occupancy. the property is already set up for multiple tenants and no construction is necessary. at the request of the city, we had a scaled plan created showing suite 100, suite 150, and the common areas. please let me know what i need to get this taken care of, as this has gone on for a couple of months and the client is getting increasingly annoyed with the process. i am going to select alternation as part of the work, but there is no work necessary to the building. it is ready to go · 172 m away
- 9007 Woodhurst DrJun 10, 2026Additional · 181 m away
- 9111 Stone Creek PlJan 8, 2026Hvac changeout/alteration: remove existing equipment and install new variable-speed ac condenser · 183 m away
- 9036 Stone Creek PlJun 30, 2025Replace 4 ton complete · 188 m away
- 10 Twin BridgeApr 13, 2026Replacing 2 ton gas complete system · 198 m away
- 8 Twin BridgeMar 30, 2026(2) 50 gal gas water heaters · 202 m away
- 9149 Saddlecreek DrDec 14, 2024Residential new sfr · 204 m away
- 9040 Stone Creek PlFeb 4, 2026Foundation repair · 206 m away