9016 Stone Creek Pl
Dallas, TX 75243
Stone wall replacement permitted at 9016 Stone Creek Pl
A permit indicates an old, failing wood railroad-tie wall at 9016 Stone Creek Pl will be replaced with a Milsap stone wall. The City of Dallas permit was filed August 17, 2026, and describes a wall in the same location, length and height as the original.
Summarized from City of Dallas records · updated Aug 17, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Aug 17, 2026
- since Aug 17, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsReplace and old, failing wood railroad tie wall. new milsap stone wall to be constructed in its place, same height, length and location or original. wall is approx 626 sft and 164 lnft. variable height from 2' to 5' max
Replace and old, failing wood railroad tie wall. new milsap stone wall to be constructed in its place, same height, length and location or original. wall is approx 626 sft and 164 lnft. variable height from 2' to 5' max
City of Dallas permitResidential Accessory Structure Permit
Sources: City of Dallas
Questions about 9016 Stone Creek Pl
What is being built at 9016 Stone Creek Pl?
A City of Dallas permit indicates the property owner plans to replace an old, failing wood railroad-tie wall with a Milsap stone wall. The filing date was August 17, 2026.
When was the wall replacement permitted at 9016 Stone Creek Pl?
The City of Dallas permit was filed August 17, 2026. Its permit number is RES-ACC-26-000516.
How big will the new wall at 9016 Stone Creek Pl be?
The permit describes a wall of about 626 square feet and 164 linear feet. Its height will vary from 2 to 5 feet.
What material will the replacement wall use?
The permit describes a Milsap stone wall replacing the existing wood railroad-tie wall.
Will the wall at 9016 Stone Creek Pl be in a new location?
The permit says the replacement wall will be in the same location, with the same height and length as the original.
Also being built nearby
All of 75243- 7 Twin BridgeJun 23, 2025Riser replaced at meter · 51 m away
- 9111 Stone Creek PlJan 8, 2026Hvac changeout/alteration: remove existing equipment and install new variable-speed ac condenser · 72 m away
- 9036 Stone Creek PlJun 30, 2025Replace 4 ton complete · 77 m away
- 9040 Stone Creek PlFeb 4, 2026Foundation repair · 95 m away
- 2 Twin BridgeJan 26, 2021Remove existing roof and install new roof · 109 m away
- 9639 Greenville AveSep 14, 2026Zo bc this is my fourth attempt at this process. i have a client who owns an office building they currently occupy. they have brought in a new tenant for the building and are looking to add a suite 100 and suite 150 certificate of occupancy. the property is already set up for multiple tenants and no construction is necessary. at the request of the city, we had a scaled plan created showing suite 100, suite 150, and the common areas. please let me know what i need to get this taken care of, as this has gone on for a couple of months and the client is getting increasingly annoyed with the process. i am going to select alternation as part of the work, but there is no work necessary to the building. it is ready to go · 110 m away
- 9525 Greenville AveSep 18, 2026Spot repairs on storm drains · 112 m away
- 9622 Greenville AveJul 17, 2026Installing 50 gallon electric water heater in closet · 127 m away
- 9128 Stone Creek PlApr 10, 2026Hvac system replacement · 132 m away
- 9131 Stone Creek PlJul 28, 2025Replace existing hvac unit · 146 m away
- 10 Twin BridgeApr 13, 2026Replacing 2 ton gas complete system · 160 m away
- 8 Twin BridgeMar 30, 2026(2) 50 gal gas water heaters · 163 m away