8733 N Stemmons Fwy
Dallas, TX 75247
4,072-square-foot finish-out at Q-team Building #1
Permits indicate a 4,072-square-foot finish-out at Q-team Building #1 at 8733 N Stemmons Fwy, with restrooms, lockers and a small office. The City of Dallas filed permits for the work on January 22 and May 14, 2026; both say the existing parking is to remain.
Summarized from City of Dallas records · updated May 14, 2026
- Projects
- 2
- 2 filings
- Latest filing
- May 14, 2026
- since Jan 22, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsQ-team building #1 4,072 sq ft finish out with restroom & lockers, small office • existing parking to remain 32 with 4 hcp • deferred submittal;mep subcontractor obtaining the trade permit must provide documentation to verify compliance for the green final inspection
Q-team building #1 4,072 sq ft finish out with restroom & lockers, small office • existing parking to remain 32 with 4 hcp • deferred submittal;mep subcontractor obtaining the trade permit must provide documentation to verify compliance for the green final inspection
City of Dallas permitCommercial Alteration Addition PermitQteam building #1 4,072 sq ft finish out with restroom & lockers, small office• existing parking to remain 32 with 4 hcp• deferred submittal;mep subcontractor obtaining the trade permit must provide documentation to verify compliance for the green final inspection
Qteam building #1 4,072 sq ft finish out with restroom & lockers, small office• existing parking to remain 32 with 4 hcp• deferred submittal;mep subcontractor obtaining the trade permit must provide documentation to verify compliance for the green final inspection
City of Dallas permitCommercial Alteration Addition Permit
Sources: City of Dallas
Questions about 8733 N Stemmons Fwy
What is being built at 8733 N Stemmons Fwy?
City of Dallas permits describe a 4,072-square-foot finish-out at Q-team Building #1, including restrooms, lockers and a small office.
When was the work at 8733 N Stemmons Fwy permitted?
The City of Dallas records show filings on January 22, 2026, under permit COM-ALT-ADD-26-000162, and May 14, 2026, under COM-ALT-ADD-26-000964.
How large is the finish-out at Q-team Building #1?
The permit descriptions list a 4,072-square-foot finish-out.
Will parking change at 8733 N Stemmons Fwy?
The permit descriptions say the existing parking will remain: 32 spaces, including 4 handicap spaces.
What is being built near the Extended Stay 4 Story Hotel on N Stemmons Freeway?
At 8733 N Stemmons Fwy, permits indicate a finish-out at Q-team Building #1 with restrooms, lockers and a small office. The nearby hotel is listed at 8830 N Stemmons Freeway.
Is the permit for a new building at 8733 N Stemmons Fwy?
The City of Dallas records describe a commercial alteration and addition permit for a finish-out, not new construction.
Also being built nearby
All of 75247- 8711 N Stemmons FwyOct 29, 2026Building #2 4,066 sq ft finish out with restroom & lockers, small office• existing parking to remain 31 with 4 hcp• deferred submittal: mep subcontractor obtaining the trade permit must provide documentation to verify compliance for the green final inspection · 23 m away
- 8777 N Stemmons FwyMay 26, 2026Old mary kay towers - conversion of the office buildings located at 8777 and 8787 n. stemmons freeway in dallas, texas, into for rent multifamily buildings >> tower 1 - located at 8787 n stemmons >> 8 stories >> approximately 110,000 gsf and approximately 64,400 residential rsf >> the existing bank on the ground floor will remain in operation >> 75 residential units - (13) studio units - (59) 1-bedroom units - (3) 2-bedroom units >> tower 2 - located at 8777 n stemmons >> 5 stories >> approximately 101,000 gsf and approximately 85,000 residential rsf >> 101 residential units - (18) studio units - (64) 1-bedroom units - (9) 1-bedroom + office units - (10) 2-bedroom units >> the building exteriors and roofs will not be altered other than for maintenance items or minor repairs. customer does not plan to utilize sb 840 benefits. this project will be phased by tower and by floor, a total of 13 phases. tower 1 will be phased by floor 1-8. and tower 2 will be phased by floor 1-5 · 97 m away
- 8830 N Stemmons Freeway · Northwest Hospitality, LLCJun 18, 2026Extended stay 4 story hotel — new construction — ground up four story extended stay hotel · 100 m away
- 8830 N Stemmons FwyJun 21, 2026Qteam meeting 7.9.26 (all day)- 8830 n stemmons ground up four story extended stay hotel. new construction · 100 m away
- 8625 N Stemmons FwyNov 16, 2026Continuation of permit # 2409201008_192873622-004_pl_1 construct new campus with 5 buildings · 248 m away
- 1420 Viceroy DrSep 18, 2026Install additional plugs were needed · 271 m away
- 8585 N Stemmons FwyJan 11, 2021Interior remodel only create suite 320-s · 333 m away
- 8585 N. Stemmons Freeway Suites 200s & 210s · Ricchi GroupMay 30, 2024Vitas healthcare — renovation/alteration — interior finish out · 333 m away
- 1430 Regal RowOct 21, 2026Bu zo me he pl el commercial alteration addition - new walk-in cooler installed at location · 336 m away
- 8650 King George DrNov 11, 2020Install water heater · 346 m away
- 1525 Viceroy DrApr 30, 2026Sewer repairs · 386 m away
- 8737 King George DrJun 9, 2025Replace under slab cast iron sewer lines · 404 m away