Solar and battery system permitted at 6207 Black Berry Ln
City of Dallas permits indicate a 16.53-kW solar PV system with battery storage and a Span panel at this residence. The solar and electrical permits were filed December 30, 2025. A separate permit filed February 9, 2026, covers replacing the water service line from the meter to the house.
Summarized from City of Dallas records · updated Feb 9, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Feb 9, 2026
- since Dec 30, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
3 projectsMcr with battery cassie evans-third party approved-installing a 16.53 kw pv system, 1 tesla pw3. 1 tesla dc expansion and 1 span panel
Mcr with battery cassie evans-third party approved-installing a 16.53 kw pv system, 1 tesla pw3. 1 tesla dc expansion and 1 span panel
City of Dallas permitResidential Solar/PV PermitCassie evans-third party approved- installing a 16.53 kw pv system, 1 tesla pw3. 1 tesla dc expansion and 1 span panel
Cassie evans-third party approved- installing a 16.53 kw pv system, 1 tesla pw3. 1 tesla dc expansion and 1 span panel
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 6207 Black Berry Ln
What is being built at 6207 Black Berry Ln in Dallas?
City permits indicate installation of a 16.53-kW solar PV system with battery storage and a Span panel. The permits were filed December 30, 2025.
Is a solar system being installed at 6207 Black Berry Ln?
Yes. Dallas issued a residential solar/PV permit, RES-SOLAR-25-000652, on December 30, 2025, for a 16.53-kW system with battery equipment.
Does the solar project at 6207 Black Berry Ln include battery storage?
The permit description includes one Tesla Powerwall 3 and one Tesla DC expansion, along with a 16.53-kW PV system.
When were the solar permits filed for 6207 Black Berry Ln?
The residential solar/PV permit RES-SOLAR-25-000652 and electrical permit RES-ELC-25-005444 were both filed December 30, 2025.
Was plumbing work also permitted at 6207 Black Berry Ln?
Yes. Permit RES-PLM-26-001505, filed February 9, 2026, covers replacing the water service line from the meter to the house.
Also being built nearby
All of 75248- 6210 Black Berry LnFeb 18, 2026Mcr with battery (3rd) third party approved. bert roundtree- installing a 24.19 kw pv solar system, 2 tesla pw 3, and a main panel upgrade · 15 m away
- 6226 La Cosa DrJun 30, 2026Install 25 concrete pressed pilings to stabilize house foundation · 80 m away
- 6234 La Cosa DrSep 11, 2026Installing 12 pilings · 81 m away
- 6204 La Cosa DrMay 12, 2026Gas test needed only · 86 m away
- 6215 Yellow Rock TrlJul 15, 2026Domestic water reroute · 90 m away
- 6215 La Cosa DrAug 25, 2026Electrical for hot tub · 102 m away
- 6135 Black Berry LnJan 5, 2026Reroute sewer line · 132 m away
- 6128 Black Berry LnNov 13, 2026Remove 2 existing drive approach at front and install sidewalk · 144 m away
- 6127 Black Berry LnMay 4, 2026Perform gas test and repair any leaks found · 147 m away
- 6304 La Cosa DrJan 21, 2026Gas test for meter release. no repair. gas test only. gas provider requesting city approval · 147 m away
- 6143 Yellow Rock TrlNov 12, 2025Adding five piers on the southeast and southwest corners of the home · 150 m away
- 6142 La Cosa DrNov 7, 2025Nsfaa-18'6"x12' aluminum pergola attached to house · 152 m away
More solar installs in 75248.