groundranger
Recent · latest filing Feb 2026Residential

6207 Black Berry Ln

Dallas, TX 75248

Solar and battery system permitted at 6207 Black Berry Ln

City of Dallas permits indicate a 16.53-kW solar PV system with battery storage and a Span panel at this residence. The solar and electrical permits were filed December 30, 2025. A separate permit filed February 9, 2026, covers replacing the water service line from the meter to the house.

Summarized from City of Dallas records · updated Feb 9, 2026

Projects
3
3 filings
Latest filing
Feb 9, 2026
since Dec 30, 2025
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Replace water service line from meter to house

    Replace water service line from meter to house

    City of Dallas permitResidential Plumbing Permit
    Record
    RES-PLM-26-001505
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Mcr with battery cassie evans-third party approved-installing a 16.53 kw pv system, 1 tesla pw3. 1 tesla dc expansion and 1 span panel

    Mcr with battery cassie evans-third party approved-installing a 16.53 kw pv system, 1 tesla pw3. 1 tesla dc expansion and 1 span panel

    City of Dallas permitResidential Solar/PV Permit
    Record
    RES-SOLAR-25-000652
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Cassie evans-third party approved- installing a 16.53 kw pv system, 1 tesla pw3. 1 tesla dc expansion and 1 span panel

    Cassie evans-third party approved- installing a 16.53 kw pv system, 1 tesla pw3. 1 tesla dc expansion and 1 span panel

    City of Dallas permitResidential Electrical Permit
    Record
    RES-ELC-25-005444
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 6207 Black Berry Ln

What is being built at 6207 Black Berry Ln in Dallas?

City permits indicate installation of a 16.53-kW solar PV system with battery storage and a Span panel. The permits were filed December 30, 2025.

Is a solar system being installed at 6207 Black Berry Ln?

Yes. Dallas issued a residential solar/PV permit, RES-SOLAR-25-000652, on December 30, 2025, for a 16.53-kW system with battery equipment.

Does the solar project at 6207 Black Berry Ln include battery storage?

The permit description includes one Tesla Powerwall 3 and one Tesla DC expansion, along with a 16.53-kW PV system.

When were the solar permits filed for 6207 Black Berry Ln?

The residential solar/PV permit RES-SOLAR-25-000652 and electrical permit RES-ELC-25-005444 were both filed December 30, 2025.

Was plumbing work also permitted at 6207 Black Berry Ln?

Yes. Permit RES-PLM-26-001505, filed February 9, 2026, covers replacing the water service line from the meter to the house.

Also being built nearby

All of 75248

More solar installs in 75248.

Get alerts for 6207 Black Berry Ln