6210 Black Berry Ln
Dallas, TX 75248
Residential solar system and battery installation permitted
City of Dallas permits filed February 18, 2026, indicate a 24.19 kW rooftop solar system, two Tesla Powerwall 3 batteries and a main panel upgrade at 6210 Black Berry Ln. The filings include a residential solar/PV permit and a residential electrical permit.
Summarized from City of Dallas records · updated Feb 18, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Feb 18, 2026
- since Feb 18, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsMcr with battery (3rd) third party electrian expired 07/31/24 bert roundtree- installing a 24.19 kw pv solar system, 2 tesla pw 3, and a main panel upgrade
Mcr with battery (3rd) third party electrian expired 07/31/24 bert roundtree- installing a 24.19 kw pv solar system, 2 tesla pw 3, and a main panel upgrade
City of Dallas permitResidential Solar/PV PermitMcr with battery (3rd) third party approved. bert roundtree- installing a 24.19 kw pv solar system, 2 tesla pw 3, and a main panel upgrade
Mcr with battery (3rd) third party approved. bert roundtree- installing a 24.19 kw pv solar system, 2 tesla pw 3, and a main panel upgrade
City of Dallas permitResidential Electrical Permit
Sources: City of Dallas
Questions about 6210 Black Berry Ln
What is being built at 6210 Black Berry Ln in Dallas?
City of Dallas permits indicate a 24.19 kW solar system, two Tesla Powerwall 3 batteries and a main panel upgrade at the residence. Both permits were filed February 18, 2026.
Is solar being installed at 6210 Black Berry Ln?
Yes. A City of Dallas residential solar/PV permit filed February 18, 2026, describes installation of a 24.19 kW photovoltaic solar system.
Will the solar installation have battery storage?
The permit descriptions specify two Tesla Powerwall 3 batteries alongside the 24.19 kW solar system.
Is electrical work also permitted at 6210 Black Berry Ln?
Yes. A residential electrical permit filed February 18, 2026, lists the solar system, two batteries and a main panel upgrade. Its permit number is RES-ELC-26-000971.
When were the permits filed for the solar project?
The City of Dallas solar/PV and electrical permit records were both filed February 18, 2026. Their permit numbers are RES-SOLAR-25-000447 and RES-ELC-26-000971.
How much does the solar project at 6210 Black Berry Ln cost?
The available permit records do not report a project valuation or cost.
Also being built nearby
All of 75248- 6207 Black Berry LnFeb 9, 2026Replace water service line from meter to house · 15 m away
- 6215 Yellow Rock TrlJul 15, 2026Domestic water reroute · 77 m away
- 6226 La Cosa DrJun 30, 2026Install 25 concrete pressed pilings to stabilize house foundation · 93 m away
- 6234 La Cosa DrSep 11, 2026Installing 12 pilings · 93 m away
- 6204 La Cosa DrMay 12, 2026Gas test needed only · 101 m away
- 6215 La Cosa DrAug 25, 2026Electrical for hot tub · 111 m away
- 6135 Black Berry LnJan 5, 2026Reroute sewer line · 140 m away
- 6304 La Cosa DrJan 21, 2026Gas test for meter release. no repair. gas test only. gas provider requesting city approval · 149 m away
- 6143 Yellow Rock TrlNov 12, 2025Adding five piers on the southeast and southwest corners of the home · 149 m away
- 6128 Black Berry LnNov 13, 2026Remove 2 existing drive approach at front and install sidewalk · 151 m away
- 6127 Black Berry LnMay 4, 2026Perform gas test and repair any leaks found · 155 m away
- 6140 Yellow Rock TrlAug 21, 2026Replacing 50 gallon gas water heater · 159 m away
More solar installs in 75248.