6311 Black Berry Ln
Dallas, TX 75248
Electrical upgrades and car-charger circuit permitted in Dallas
A residential electrical permit covers a 200-amp meter base, disconnect and panel, grounding, and a 40-amp car-charger circuit at 6311 Black Berry Ln. The City of Dallas permit was filed April 24, 2026.
Summarized from City of Dallas records · updated Apr 24, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 24, 2026
- since Apr 24, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6311 Black Berry Ln
What work is planned at 6311 Black Berry Ln?
A City of Dallas residential electrical permit covers a 200-amp meter base, disconnect and panel, grounding, and a 40-amp car-charger circuit.
Is a car charger being installed at 6311 Black Berry Ln?
The permit description specifies a 40-amp car-charger circuit. It does not state that a charger unit is being installed.
When was the electrical permit filed for 6311 Black Berry Ln?
The permit was filed April 24, 2026.
What is the permit number for 6311 Black Berry Ln?
The City of Dallas permit number is RES-ELC-26-002342, filed April 24, 2026.
Is new construction planned at 6311 Black Berry Ln?
The record is for a residential electrical permit, not a new-construction permit. It describes electrical equipment upgrades and a car-charger circuit.
Also being built nearby
All of 75248- 15302 Leafy LnOct 23, 2026Lennox 5 ton el18kcv horizontal gas complete/ hvac replacement · 94 m away
- 15415 Cypress Hills DrJan 11, 2021Remodel existing plumbing · 95 m away
- 6304 La Cosa DrJan 21, 2026Gas test for meter release. no repair. gas test only. gas provider requesting city approval · 105 m away
- 15319 Cypress Hills DrNov 11, 2020Interior & exterior remodel; no addition · 127 m away
- 15309 Cypress Hills DrJan 22, 2021Gas relay or repair with test · 137 m away
- 15210 Leafy LnJul 2, 2026Tub to shower conversion with new valve · 174 m away
- 6215 La Cosa DrAug 25, 2026Electrical for hot tub · 176 m away
- 15206 Leafy LnJul 29, 2026Customers gas is shut off, they need a gas test & inspection · 177 m away
- 6210 Black Berry LnFeb 18, 2026Mcr with battery (3rd) third party approved. bert roundtree- installing a 24.19 kw pv solar system, 2 tesla pw 3, and a main panel upgrade · 185 m away
- 6207 Black Berry LnFeb 9, 2026Replace water service line from meter to house · 192 m away
- 6234 La Cosa DrSep 11, 2026Installing 12 pilings · 195 m away
- 6226 La Cosa DrJun 30, 2026Install 25 concrete pressed pilings to stabilize house foundation · 206 m away