7027 Cloverglen Dr
Dallas, TX 75249
Residential gas-line work permitted at 7027 Cloverglen Dr
City of Dallas permits indicate a gas test and replacement of a 27-foot section of gas line at this residence. The permits were filed August 18 and August 26, 2025.
Summarized from City of Dallas records · updated Aug 26, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Aug 26, 2025
- since Aug 18, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Dallas
Questions about 7027 Cloverglen Dr
What work is planned at 7027 Cloverglen Dr?
City of Dallas permit records describe a gas test and excavation to replace a 27-foot section of gas line.
When were the permits filed for 7027 Cloverglen Dr?
The two residential plumbing permits were filed August 18 and August 26, 2025.
How much gas line is being replaced at 7027 Cloverglen Dr?
The August 26, 2025 permit, RES-PLM-25-004110, describes replacing a 27-foot section of gas line.
What is permit RES-PLM-25-003806 for?
The City of Dallas filed this residential plumbing permit on August 18, 2025, for a gas test.
Is a new home being built at 7027 Cloverglen Dr?
The records provided describe residential plumbing work—a gas test and gas-line replacement—not a new home construction project.
Also being built nearby
All of 75249- 7019 Cloverglen DrJul 29, 202550 gallon/gas water heater replacement · 11 m away
- 7107 Blackwillow LnJun 23, 2026Gas water heater replacement · 51 m away
- 7105 Cloverglen DrMay 16, 2025Tear off existing shingles and install 32sq of certainteed landmark · 108 m away
- 7115 Cloverglen DrMay 29, 2025Replace panel · 121 m away
- 7123 Cloverglen DrApr 1, 2026Install a new square d qo 200 amp outdoor disconnect switch and interior 200 amp panel · 131 m away
- 9605 Blackwillow CtApr 9, 2026Mcr with battery installation of a 6.970 kw dc / 5.070 kw ac roof?mounted solar pv system with (2) sonnenhome battery 11 (20 kwh each), including required disconnects, load center, rapid shutdown equipment, and system controller. scope includes a full service upgrade consisting of a new 200a main service panel and new meter base per engineered plans · 145 m away
- 9818 Emory Oak CirMar 4, 2026Gas relay yard line & gas test · 147 m away
- 9611 Blackwillow CtDec 8, 2020Install roofing mountage solar panels · 148 m away
- 7220 Blackwillow LnNov 16, 2026Sewer repair · 174 m away
- 7124 Cloverglen DrOct 15, 2026Gas meter release · 182 m away
- 7128 Cloverglen DrAug 31, 2026Gas test for service reinstatement · 189 m away
- 7123 Emory Oak LnJul 18, 2025Replace 2.5 ton complete heat pump system · 200 m away