7107 Blackwillow Ln
Dallas, TX 75249
Gas water heater replacement permitted at 7107 Blackwillow Ln
A gas water heater replacement was permitted at 7107 Blackwillow Ln in Dallas on June 23, 2026. The City of Dallas record lists it as a residential plumbing permit, number RES-PLM-26-006452.
Summarized from City of Dallas records · updated Jun 23, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 23, 2026
- since Jun 23, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7107 Blackwillow Ln
What is being done at 7107 Blackwillow Ln?
A gas water heater is being replaced, according to City of Dallas permit RES-PLM-26-006452, filed June 23, 2026.
When was the water heater replacement permitted?
The City of Dallas issued a record for the residential plumbing permit on June 23, 2026.
What is the permit number for 7107 Blackwillow Ln?
The permit number is RES-PLM-26-006452. It covers a gas water heater replacement.
Is new construction planned at 7107 Blackwillow Ln?
The available City of Dallas record describes a gas water heater replacement, not new construction.
What kind of permit was filed for 7107 Blackwillow Ln?
It is listed as a residential plumbing permit. The recorded work is a gas water heater replacement.
Also being built nearby
All of 75249- 7019 Cloverglen DrJul 29, 202550 gallon/gas water heater replacement · 41 m away
- 7027 Cloverglen DrAug 26, 2025We will be excavating to replace a 27ft section of gas line · 51 m away
- 7105 Cloverglen DrMay 16, 2025Tear off existing shingles and install 32sq of certainteed landmark · 157 m away
- 9605 Blackwillow CtApr 9, 2026Mcr with battery installation of a 6.970 kw dc / 5.070 kw ac roof?mounted solar pv system with (2) sonnenhome battery 11 (20 kwh each), including required disconnects, load center, rapid shutdown equipment, and system controller. scope includes a full service upgrade consisting of a new 200a main service panel and new meter base per engineered plans · 160 m away
- 9611 Blackwillow CtDec 8, 2020Install roofing mountage solar panels · 163 m away
- 9818 Emory Oak CirMar 4, 2026Gas relay yard line & gas test · 168 m away
- 7115 Cloverglen DrMay 29, 2025Replace panel · 170 m away
- 7123 Cloverglen DrApr 1, 2026Install a new square d qo 200 amp outdoor disconnect switch and interior 200 amp panel · 180 m away
- 7220 Blackwillow LnNov 16, 2026Sewer repair · 212 m away
- 7124 Cloverglen DrOct 15, 2026Gas meter release · 231 m away
- 7128 Cloverglen DrAug 31, 2026Gas test for service reinstatement · 238 m away
- 7123 Emory Oak LnJul 18, 2025Replace 2.5 ton complete heat pump system · 252 m away