9605 Blackwillow Ct
Dallas, TX 75249
Rooftop solar and two batteries permitted at 9605 Blackwillow Ct
A City of Dallas permit filed April 9, 2026, covers a 6.970 kW DC rooftop solar system with two 20 kWh batteries at 9605 Blackwillow Ct. The work also includes a new 200-amp main service panel and meter base.
Summarized from City of Dallas records · updated Apr 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Apr 9, 2026
- since Apr 9, 2026
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectMcr with battery installation of a 6.970 kw dc / 5.070 kw ac roof?mounted solar pv system with (2) sonnenhome battery 11 (20 kwh each), including required disconnects, load center, rapid shutdown equipment, and system controller. scope includes a full service upgrade consisting of a new 200a main service panel and new meter base per engineered plans
Mcr with battery installation of a 6.970 kw dc / 5.070 kw ac roof?mounted solar pv system with (2) sonnenhome battery 11 (20 kwh each), including required disconnects, load center, rapid shutdown equipment, and system controller. scope includes a full service upgrade consisting of a new 200a main service panel and new meter base per engineered plans
City of Dallas permitResidential Solar/PV Permit
Sources: City of Dallas
Questions about 9605 Blackwillow Ct
What is being built at 9605 Blackwillow Ct?
A City of Dallas permit covers a rooftop solar photovoltaic system with two batteries, along with electrical service upgrades. The permit was filed April 9, 2026.
Is solar being installed at 9605 Blackwillow Ct in Dallas?
Yes. Permit RES-SOLAR-26-000164 describes a 6.970 kW DC, 5.070 kW AC rooftop solar system.
Will the solar installation at 9605 Blackwillow Ct include batteries?
Yes. The permit lists two sonnenhome batteries, each with 20 kWh capacity.
What electrical work is included at 9605 Blackwillow Ct?
The permit includes a new 200-amp main service panel and meter base, as well as equipment required for the solar and battery system.
When was the solar permit filed for 9605 Blackwillow Ct?
The City of Dallas filed permit RES-SOLAR-26-000164 on April 9, 2026.
Also being built nearby
All of 75249- 9611 Blackwillow CtDec 8, 2020Install roofing mountage solar panels · 4 m away
- 7220 Blackwillow LnNov 16, 2026Sewer repair · 99 m away
- 7231 Blackwillow LnOct 30, 2020Roof replacement · 129 m away
- 7105 Cloverglen DrMay 16, 2025Tear off existing shingles and install 32sq of certainteed landmark · 138 m away
- 7115 Cloverglen DrMay 29, 2025Replace panel · 142 m away
- 7123 Cloverglen DrApr 1, 2026Install a new square d qo 200 amp outdoor disconnect switch and interior 200 amp panel · 144 m away
- 7027 Cloverglen DrAug 26, 2025We will be excavating to replace a 27ft section of gas line · 145 m away
- 7019 Cloverglen DrJul 29, 202550 gallon/gas water heater replacement · 150 m away
- 7107 Blackwillow LnJun 23, 2026Gas water heater replacement · 160 m away
- 7124 Cloverglen DrOct 15, 2026Gas meter release · 173 m away
- 7128 Cloverglen DrAug 31, 2026Gas test for service reinstatement · 177 m away
- 7209 Cloverglen DrSep 10, 2026A.o. smith signature 100 50-gallons tall 6-year warranty 40000-btu natural gas water heater replacement like-for-like · 206 m away
More solar installs in 75249.