Recent · latest filing Jul 2025Commercial
6901 Mccallum Blvd
Dallas, TX 75252
Electrical service permitted for a city traffic signal
A City of Dallas permit covers electrical service for a city traffic signal at 6901 McCallum Blvd. The permit was filed on July 3, 2025, under permit number COM-ELC-25-000719.
Summarized from City of Dallas records · updated Jul 3, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 3, 2025
- since Jul 3, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 6901 Mccallum Blvd
What is being built at 6901 McCallum Blvd?
A City of Dallas permit indicates electrical service for a city traffic signal. It was filed July 3, 2025.
What work does permit COM-ELC-25-000719 cover?
The permit covers electrical service for a city traffic signal at 6901 McCallum Blvd.
When was the traffic signal electrical permit filed?
The City of Dallas permit was filed on July 3, 2025.
Is a new commercial building being built at 6901 McCallum Blvd?
The permit record describes electrical service for a city traffic signal.
Which city issued the permit for work at 6901 McCallum Blvd?
The permit source is the City of Dallas. Its number is COM-ELC-25-000719.
Also being built nearby
All of 75252- 6900 Mccallum BlvdAug 21, 2026Temporary power pole · 25 m away
- 6950 Mccallum BlvdJun 29, 2026Dsst-pvt montessori academy construction of a 6' high metal entry vestibule/enclosure.location: front building entrance.dimensions: 9' (left return) x 10' (front) x 9' (right return).material: black metalmounting: posts are surface-mounted to the concrete deck with base plates · 62 m away
- 6821 Mccallum BlvdMar 5, 2026-install one new twenty-foot four-by-four square steel light pole-excavate and form new concrete pier foundation for pole installation-install required underground conduit and conductors from existing source to new pole location · 120 m away
- 7113 Highland Heather LnMar 10, 2026Replace 1- 50 gallon water heater · 147 m away
- 7110 Highland Heather LnOct 9, 2025Electrical for addition · 155 m away
- 7114 Highland Heather LnOct 1, 2026Install 6 pilings; adjust existing pilings · 157 m away
- 17407 Oakington CtMar 11, 2026Up to 5 · 159 m away
- 17415 Oakington CtJul 5, 2026Whole home drain re-pipe · 160 m away
- 7205 Highland Heather LnJul 1, 2026Full system install · 187 m away
- 7215 Highland Heather LnOct 17, 202526 piers · 193 m away
- 6802 Rocky Top CirSep 8, 2025200 amp panel and meter base replacement · 197 m away
- 7206 Highland Heather LnMar 30, 2026Gas test · 200 m away