14140 Haymeadow Dr
Dallas, TX 75254
14140 Haymeadow Dr: 1 project on record
City of Dallas lists 1 filing across 1 project at 14140 Haymeadow Dr, Dallas, TX 75254. The most recent, filed November 20, 2020, covers: “Re-wire main meter socket lugs”.
Compiled from City of Dallas records · updated Nov 20, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Nov 20, 2020
- since Nov 20, 2020
- Largest scope
- —
- Listed value
- $5
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 14140 Haymeadow Dr
What is being built at 14140 Haymeadow Dr?
The latest filing (City of Dallas permit 2011206007, November 20, 2020) covers re-wire main meter socket lugs.
How many permits and filings does 14140 Haymeadow Dr have?
1 filing across 1 project, from November 20, 2020 to November 20, 2020.
How much is the construction at 14140 Haymeadow Dr worth?
Permits at this address list about $5 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 14140 Haymeadow Dr?
Yes. Nearby filings include 7821 Spring Valley Rd (erect attached sign, Dec 8, 2020); 7831 Spring Valley Rd (electrical repairs, Jan 28, 2021); 7798 Spring Valley Rd (install house panel for all security and house lighting, Oct 20, 2026).
How do I get alerts for new permits at 14140 Haymeadow Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75254- 7821 Spring Valley RdDec 8, 2020Erect attached sign · 85 m away
- 7831 Spring Valley RdJan 28, 2021Electrical repairs · 90 m away
- 7798 Spring Valley RdOct 20, 2026Install house panel for all security and house lighting · 93 m away
- 7824 Spring Valley RdDec 7, 20203 antennas 3 rrhs 2 heliax fiberfeeds 2 hybrid cables 1 sa sabre · 99 m away
- 14116 Edgecrest DrJun 8, 2026Gas to pool heater and gas reroute · 106 m away
- 14124 Edgecrest DrNov 12, 2025: rear fence repair: approximately 115 linear feet, plus or minus. 4x4 eleven-gauge metal posts will be used and put3 feet into the ground with concrete. then, a footer will be dug out about sixteen inches down, and concrete will be poured to 2feet above grade. treated 2x4s will be used to frame out in between the metal posts. concrete board will be attached totreated wood. then, a smear coat of concrete mixture will be put over to blend everything and make it one continuous piece at8ft tall. then, horizontal board-on-board with top cap. the gate will be modified to handle a 10ft horizontal board-on-board. thegate, motor, and track will be moved out to make the fence and gate straight in line. then stain all woold to clients choice ofcolor · 107 m away
- 14108 Edgecrest DrJul 22, 2025Foundation repair-install 7 steel piers under the home to stabilize the foundation · 113 m away
- 14132 Edgecrest DrFeb 11, 2026Replace main gas line · 116 m away
- 14140 Edgecrest DrJul 30, 2026Working with inspector to get a rough/top out/and final inspection with a hydrostatic test and gas test etc · 130 m away
- 7619 Spring Valley RdJul 26, 2026Upgrade service · 175 m away
- 7609 Spring Valley RdOct 6, 2026Hvac change out · 179 m away
- 14207 Haymeadow DrNov 5, 2026Mcr with battery 3rd party approved plans - andrew devlieger - installation of a grid tied, roof mounted, solar pv system with batteries, with an mpu relocate · 179 m away