groundranger
Recent · latest filing Jul 2025Residential

14108 Edgecrest Dr

Dallas, TX 75254

14108 Edgecrest Dr: 2 projects on record

City of Dallas lists 2 filings across 2 projects at 14108 Edgecrest Dr, Dallas, TX 75254. The most recent, filed July 22, 2025, covers: “Foundation repair-install 7 steel piers under the home to stabilize the foundation”.

Compiled from City of Dallas records · updated Jul 22, 2025

Projects
2
2 filings
Latest filing
Jul 22, 2025
since Jul 22, 2025
Largest scope
—
Listed value
—

Permit & project history

2 projects
  1. Foundation repair-install 7 steel piers under the home to stabilize the foundation

    Foundation repair-install 7 steel piers under the home to stabilize the foundation

    City of Dallas permitResidential Foundation Repair
    Record
    RES-FDN-25-000266
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Interior & exterior remodel; no addition

    Interior & exterior remodel; no addition

    City of Dallas permitBuilding (BU) Single Family Renovation
    Record
    2007181036
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Dallas

Questions about 14108 Edgecrest Dr

What is being built at 14108 Edgecrest Dr?

The latest filing (City of Dallas permit RES-FDN-25-000266, July 22, 2025) covers foundation repair-install 7 steel piers under the home to stabilize the foundation.

How many permits and filings does 14108 Edgecrest Dr have?

2 filings across 2 projects, from July 22, 2025 to July 22, 2025.

Is there other construction near 14108 Edgecrest Dr?

Yes. Nearby filings include 14116 Edgecrest Dr (gas to pool heater and gas reroute, Jun 8, 2026); 14124 Edgecrest Dr (: rear fence repair: approximately 115 linear feet, plus or minus. 4x4 eleven-gauge metal posts will be used and put3 feet into the ground with concrete. then, a footer will be dug out about sixteen inches down, and concrete will be poured to 2feet above grade. treated 2x4s will be used to frame out in between the metal posts. concrete board will be attached totreated wood. then, a smear coat of concrete mixture will be put over to blend everything and make it one continuous piece at8ft tall. then, horizontal board-on-board with top cap. the gate will be modified to handle a 10ft horizontal board-on-board. thegate, motor, and track will be moved out to make the fence and gate straight in line. then stain all woold to clients choice ofcolor, Nov 12, 2025); 7619 Spring Valley Rd (upgrade service, Jul 26, 2026).

How do I get alerts for new permits at 14108 Edgecrest Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 75254
Get alerts for 14108 Edgecrest Dr