New swimming pool permitted at 14116 Edgecrest Dr
Dallas records show a permit for a new swimming pool at 14116 Edgecrest Dr, filed April 24, 2026. Electrical permits to wire the pool followed on April 27 and June 1, and a June 8 plumbing permit covers gas to a pool heater and a gas reroute.
Summarized from City of Dallas records · updated Jun 8, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Jun 8, 2026
- since Nov 11, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
5 projectsSources: City of Dallas
Questions about 14116 Edgecrest Dr
What is being built at 14116 Edgecrest Dr?
City of Dallas records indicate a new swimming pool. The residential pool permit, RES-POOL-26-000204, was filed April 24, 2026.
When was the pool permit filed at 14116 Edgecrest Dr?
The City of Dallas filed residential pool permit RES-POOL-26-000204 on April 24, 2026.
Are there permits for pool wiring at 14116 Edgecrest Dr?
Yes. Dallas electrical permits to wire a swimming pool were filed April 27, 2026 (RES-ELC-26-002353) and June 1, 2026 (RES-ELC-26-003130).
Will the pool at 14116 Edgecrest Dr have a gas heater?
A June 8, 2026, plumbing permit describes gas to a pool heater and a gas reroute. The record does not specify the heater type.
What other work was permitted at 14116 Edgecrest Dr?
A Dallas roofing permit filed November 11, 2025, describes removing and replacing composition shingles. The later 2026 permits cover the swimming pool and related electrical and gas work.
Also being built nearby
All of 75254- 14124 Edgecrest DrNov 12, 2025: rear fence repair: approximately 115 linear feet, plus or minus. 4x4 eleven-gauge metal posts will be used and put3 feet into the ground with concrete. then, a footer will be dug out about sixteen inches down, and concrete will be poured to 2feet above grade. treated 2x4s will be used to frame out in between the metal posts. concrete board will be attached totreated wood. then, a smear coat of concrete mixture will be put over to blend everything and make it one continuous piece at8ft tall. then, horizontal board-on-board with top cap. the gate will be modified to handle a 10ft horizontal board-on-board. thegate, motor, and track will be moved out to make the fence and gate straight in line. then stain all woold to clients choice ofcolor · 25 m away
- 14108 Edgecrest DrJul 22, 2025Foundation repair-install 7 steel piers under the home to stabilize the foundation · 32 m away
- 14132 Edgecrest DrFeb 11, 2026Replace main gas line · 57 m away
- 14140 Edgecrest DrJul 30, 2026Working with inspector to get a rough/top out/and final inspection with a hydrostatic test and gas test etc · 85 m away
- 7619 Spring Valley RdJul 26, 2026Upgrade service · 87 m away
- 7609 Spring Valley RdOct 6, 2026Hvac change out · 90 m away
- 14140 Haymeadow DrNov 20, 2020Re-wire main meter socket lugs · 106 m away
- 7517 Spring Valley RdDec 10, 2020Sewer relay · 121 m away
- 7507 Spring Valley RdOct 17, 2025Removing existing roof and replacing with gaf timberline hdz · 124 m away
- 7798 Spring Valley RdOct 20, 2026Install house panel for all security and house lighting · 134 m away
- 7821 Spring Valley RdDec 8, 2020Erect attached sign · 150 m away
- 7538 Overdale DrAug 5, 2025Gas leak repair to restore gas test · 158 m away
More pools in 75254.