7507 Spring Valley Rd
Dallas, TX 75254
Roof replacement permitted at 7507 Spring Valley Rd
A residential roofing permit at 7507 Spring Valley Rd covers removing the existing roof and replacing it with GAF Timberline HDZ shingles. The City of Dallas issued the permit on October 17, 2025.
Summarized from City of Dallas records · updated Oct 17, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Oct 17, 2025
- since Oct 17, 2025
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Dallas
Questions about 7507 Spring Valley Rd
What work is being done at 7507 Spring Valley Rd?
A City of Dallas residential roofing permit covers removing the existing roof and replacing it with GAF Timberline HDZ shingles.
When was the roof replacement permitted at 7507 Spring Valley Rd?
The permit was filed on October 17, 2025. Its permit number is RES-ROOF-25-001053.
Is a new home being built at 7507 Spring Valley Rd?
The available permit record is for roof replacement, not new home construction. It describes removing the existing roof and installing GAF Timberline HDZ shingles.
What type of shingles are going on the roof at 7507 Spring Valley Rd?
The permit description specifies GAF Timberline HDZ shingles.
What roofing work is happening near S. P. Vasquez Enterprises on Peyton Drive?
A residential roof replacement was permitted at 7507 Spring Valley Rd, about 229 meters from S. P. Vasquez Enterprises at 13959 Peyton Drive. The permit was filed October 17, 2025.
Also being built nearby
All of 75254- 7517 Spring Valley RdDec 10, 2020Sewer relay · 5 m away
- 7609 Spring Valley RdOct 6, 2026Hvac change out · 47 m away
- 7619 Spring Valley RdJul 26, 2026Upgrade service · 52 m away
- 7538 Spring Valley RdAug 18, 2026Slab leak repair · 93 m away
- 14108 Edgecrest DrJul 22, 2025Foundation repair-install 7 steel piers under the home to stabilize the foundation · 109 m away
- 14116 Edgecrest DrJun 8, 2026Gas to pool heater and gas reroute · 124 m away
- 7538 Overdale DrAug 5, 2025Gas leak repair to restore gas test · 128 m away
- 7530 Overdale DrSep 22, 2026Reroof · 137 m away
- 14124 Edgecrest DrNov 12, 2025: rear fence repair: approximately 115 linear feet, plus or minus. 4x4 eleven-gauge metal posts will be used and put3 feet into the ground with concrete. then, a footer will be dug out about sixteen inches down, and concrete will be poured to 2feet above grade. treated 2x4s will be used to frame out in between the metal posts. concrete board will be attached totreated wood. then, a smear coat of concrete mixture will be put over to blend everything and make it one continuous piece at8ft tall. then, horizontal board-on-board with top cap. the gate will be modified to handle a 10ft horizontal board-on-board. thegate, motor, and track will be moved out to make the fence and gate straight in line. then stain all woold to clients choice ofcolor · 141 m away
- 7429 Paldao DrSep 14, 2026P-trap · 159 m away
- 7429 Paldao DrNov 25, 2025Remodel and addition · 159 m away
- 14132 Edgecrest DrFeb 11, 2026Replace main gas line · 164 m away