7517 Spring Valley Rd
Dallas, TX 75254
7517 Spring Valley Rd: 1 project on record
City of Dallas lists 1 filing across 1 project at 7517 Spring Valley Rd, Dallas, TX 75254. The most recent, filed December 10, 2020, covers: “Sewer relay”.
Compiled from City of Dallas records · updated Dec 10, 2020
- Projects
- 1
- 1 filings
- Latest filing
- Dec 10, 2020
- since Dec 10, 2020
- Largest scope
- —
- Listed value
- $5
- partial · often understated
Permit & project history
1 projectSources: City of Dallas
Questions about 7517 Spring Valley Rd
What is being built at 7517 Spring Valley Rd?
The latest filing (City of Dallas permit 2012103027, December 10, 2020) covers sewer relay.
How many permits and filings does 7517 Spring Valley Rd have?
1 filing across 1 project, from December 10, 2020 to December 10, 2020.
How much is the construction at 7517 Spring Valley Rd worth?
Permits at this address list about $5 in valuations. Permit valuations are often partial and understate total project cost.
Is there other construction near 7517 Spring Valley Rd?
Yes. Nearby filings include 7507 Spring Valley Rd (removing existing roof and replacing with gaf timberline hdz, Oct 17, 2025); 7609 Spring Valley Rd (hvac change out, Oct 6, 2026); 7619 Spring Valley Rd (upgrade service, Jul 26, 2026).
How do I get alerts for new permits at 7517 Spring Valley Rd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 75254- 7507 Spring Valley RdOct 17, 2025Removing existing roof and replacing with gaf timberline hdz · 5 m away
- 7609 Spring Valley RdOct 6, 2026Hvac change out · 43 m away
- 7619 Spring Valley RdJul 26, 2026Upgrade service · 47 m away
- 7538 Spring Valley RdAug 18, 2026Slab leak repair · 98 m away
- 14108 Edgecrest DrJul 22, 2025Foundation repair-install 7 steel piers under the home to stabilize the foundation · 105 m away
- 14116 Edgecrest DrJun 8, 2026Gas to pool heater and gas reroute · 121 m away
- 7538 Overdale DrAug 5, 2025Gas leak repair to restore gas test · 130 m away
- 14124 Edgecrest DrNov 12, 2025: rear fence repair: approximately 115 linear feet, plus or minus. 4x4 eleven-gauge metal posts will be used and put3 feet into the ground with concrete. then, a footer will be dug out about sixteen inches down, and concrete will be poured to 2feet above grade. treated 2x4s will be used to frame out in between the metal posts. concrete board will be attached totreated wood. then, a smear coat of concrete mixture will be put over to blend everything and make it one continuous piece at8ft tall. then, horizontal board-on-board with top cap. the gate will be modified to handle a 10ft horizontal board-on-board. thegate, motor, and track will be moved out to make the fence and gate straight in line. then stain all woold to clients choice ofcolor · 137 m away
- 7530 Overdale DrSep 22, 2026Reroof · 139 m away
- 14132 Edgecrest DrFeb 11, 2026Replace main gas line · 161 m away
- 7429 Paldao DrSep 14, 2026P-trap · 162 m away
- 7429 Paldao DrNov 25, 2025Remodel and addition · 162 m away