New townhomes in Dallas 75243
10 addresses in 75243 have permits or project filings for townhomes in the last two years. The most recent was filed at 12629 Hornbeam Dr.
Latest filings
- 12629 Hornbeam DrJun 1, 2026Gas line repair and test for 12631 hornbeam, this is a duplex
- 9410 Timberleaf DrApr 15, 2026Hvac replacement. install 2.5 ton electric complete system
- 9696 Skillman StMar 16, 2026A 3,490 square foot closed to public pharmacy remodel on the first floor of an existing 3-story office building
- 9440 Timberleaf DrOct 6, 2025We are replacing the sewer lines under the home via tunnel access
- 9456 Timberleaf DrAug 22, 202545ft tunnel sewer repairs and double cleanouts & adding hose bibb & emergency shut off valve
- 9414 Timberleaf DrAug 15, 2025• installing 3 total pilings (2 exterior, 1 via tunnel).• tunnel 5 lf.these are townhomes. the city advised us to apply for residential permits, with one permit per address
- 9406 Timberleaf DrAug 15, 2025• installing 12 total pilings (5 exterior, 7 via tunnel).• tunnel 27 lf.these are townhomes. the city advised us to apply for residential permits, with one permit per address
- 9426 Timberleaf DrAug 15, 2025• installing 7 total pilings (1 exterior, 6 via tunnel).• tunnel 38 lf.these are townhomes. the city advised us to apply for residential permits, with one permit per address
- 13321 Fall Manor DrJul 1, 2025Duplex side 13322 fall manor - gas testtried to call city several times to correct issue
- 12033 Leisure WayMay 23, 2025Gas test for atmos gas service restore. please note - this is a duplex. address for inspection is 12033 - unit on right hand side. thank you so much for the help!
Questions
What townhomes are being built in Dallas 75243?
10 addresses in 75243 have permits or project filings for townhomes in the last two years. The most recent was filed at 12629 Hornbeam Dr. Others include 9410 Timberleaf Dr, 9696 Skillman St, 9440 Timberleaf Dr.
How can I find out when a new townhome is permitted near me?
Watch your ZIP code or address on groundranger to get an email as soon as a new townhome permit is filed.