2330 N International Parkway
Dfw Airport, TX 75261 · Dfw Terminal C - Phase 2, Dfw Terminal C - Phase 3 + 6 more
DFW Terminal C renovation spans multiple phases
DFW Terminal C, a multi-tenant airport terminal, is undergoing phased renovations that include replacing concourse areas and renovating lower levels. TDLR registrations for work in the northern and central thirds of the terminal were filed June 27, 2025; Phase 1A registrations were filed in February 2024.
Summarized from Texas Department of Licensing and Regulation records · updated Jun 27, 2025
- Projects
- 11
- 11 filings
- Latest filing
- Jun 27, 2025
- since Feb 19, 2024
- Largest scope
- 540,000 sf
- Estimated cost
- $503M
- state registration
Where this project stands
Under constructionDFW Terminal C - Phase 2
383,980 sq ft · $503M est.
- RegisteredJun 27, 2025
- Plan review
- ConstructionJun '26 – Sep '28
- Inspected
- Closed
4 contacts on this project · 3 phone numbers
Permit & project history
11 projectsReplacement of concourse level and renovations of lower level – northern third of terminal c — dallas fort worth international airport terminal c
TDLR project registrationRenovation/AlterationReview Complete383,980 sq ft$503M est.- Project #
- TABS2025022276
- Tenant / owner
- Dfw Terminal C - Phase 2
- Design firm
- Pro
- Contact
- Pro
Replacement of concourse level and renovations of lower level - central third of terminal c — dallas fort worth international airport terminal c
TDLR project registrationRenovation/AlterationReview Complete353,033 sq ft$412M est.- Project #
- TABS2025022272
- Tenant / owner
- Dfw Terminal C - Phase 3
- Design firm
- Pro
- Contact
- Pro
This work scope includes the addition of a passenger access corridor to move patrons beyond the construction area and minimize the impact to airport operations. — dallas fort worth international airport
TDLR project registrationRenovation/AlterationProject Closed540,000 sq ft$11M est.- Project #
- TABS2024012823
- Tenant / owner
- Pro
- Design firm
- Pro
- Contact
- Pro
The renovation of this area in terminal c includes, civil, architectural, structural, fire protection, mep, and communications of the core and shell of the ramp, concourse and third levels. — dallas fort worth international airport
TDLR project registrationRenovation/AlterationReview Complete540,000 sq ft$332M est.- Project #
- TABS2024012026
- Tenant / owner
- Dfw Central Terminal Area Expansion Terminal C - Phase 1a
- Design firm
- Pro
- Contact
- Pro
This scope includes civil and telecom work to create a construction access gate at the south end of terminal c by running electricity/communications to a manned security gate w an electronically controlled arm. — dallas fort worth international airport
TDLR project registrationRenovation/AlterationProject Closed9,687 sq ft$5.0M est.- Project #
- TABS2024011875
- Tenant / owner
- Dfw Ctae -Terminal C - Phase 1a - Construction Entrance Gate
- Design firm
- Pro
- Contact
- Pro
The scope of this work includes the renovation to the existing security checkpoint at gate c11, with architectural, mechanical, electrical, fire protection/alarm and communications systems. — dallas fort worth international airport
TDLR project registrationRenovation/AlterationProject Closed5,922 sq ft$2.0M est.- Project #
- TABS2024011851
- Tenant / owner
- Dfw C11 Gate Area
- Design firm
- Pro
- Contact
- Pro
Package c5 - pier c passenger boarding bridge equipment: project includes the passenger boarding bridge equipment and fixed bridges to serve the new pier c gates. — dallas fort worth international airport, terminal c
TDLR project registrationNew ConstructionReview Complete15,193 sq ft$12M est.- Project #
- TABS2024007654
- Tenant / owner
- Central Terminal Area Renovation Terminals C And A - Package C5
- Design firm
- Pro
- Contact
- Pro
Project consists of the renovation of existing spaces to function as temporary boarding area & gate lounges for gates c26 & c27.additionally, this project will relocate the existing aa a rebooking center to a new location. — dallas fort worth international airport, terminal c
TDLR project registrationRenovation/AlterationProject Closed11,552 sq ft$1.2M est.- Project #
- TABS2024007652
- Tenant / owner
- Central Terminal Area Renovation Terminals C And A - Package C2
- Design firm
- Pro
- Contact
- Pro
Package c2 - terminal c renovation - enabling gates c26 and c27, and rebooking center relocation: project consists of the renovation of existing spaces to function as temporary boarding area and gate lounges for gates c26 and c27. additionally, this — dfw, terminal c
TDLR project registrationRenovation/AlterationProject Closed11,552 sq ft$1.2M est.- Project #
- TABS2024006668
- Tenant / owner
- Central Terminal Area Renovation Terminals C And A - Package C2
- Design firm
- Pro
- Contact
- Pro
Package c5 - pier c passenger boarding bridge equipment: project includes the passenger boarding bridge equipment and fixed bridges to serve the new pier c gates. — dfw airport, terminal c
TDLR project registrationNew ConstructionProject Closed15,193 sq ft$12M est.- Project #
- TABS2024006652
- Tenant / owner
- Central Terminal Area Renovation Terminals C And A - Package C5
- Design firm
- Pro
- Contact
- Pro
Package c4 - pier c building - core, shell and interiors: project consists of new construction to add a pier on the south skylink side of the terminal providing a total of 10 gates (6 new gates, plus 4 existing gates to be reconfigured) — dallas fort worth international airport, terminal c
TDLR project registrationNew ConstructionInspection Complete139,453 sq ft$104M est.- Project #
- TABS2024006600
- Tenant / owner
- Central Terminal Area Renovation Terminals C And A - Package C4
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 2330 N International Parkway
What is being renovated at 2330 N International Parkway?
DFW Terminal C is undergoing phased renovations. The latest registrations describe concourse replacement and lower-level renovations in the terminal’s northern and central thirds.
When were the latest Terminal C renovation projects filed?
The registrations for Terminal C Phases 2 and 3 were filed June 27, 2025. They are listed as TABS2025022276 and TABS2025022272.
What work is included in Terminal C Phase 1A?
The Phase 1A registration describes civil, architectural, structural, fire protection, mechanical, electrical and communications work to the ramp, concourse and third-level core and shell. It was filed February 20, 2024, as TABS2024012026.
How much of Terminal C is covered by Phases 2 and 3?
The TDLR registrations list 383,980 square feet for Phase 2 in the northern third and 353,033 square feet for Phase 3 in the central third.
Is the work at DFW Terminal C a new building?
The registrations describe renovations and alterations to the existing terminal, including concourse replacement and lower-level work.
What's being renovated near DFW Terminal D?
TDLR records show phased renovation work at DFW Terminal C, about 360 meters from Terminal D. The work includes concourse replacement and lower-level renovations.
Also being built nearby
All of 75261- 2330 N International Pkwy · City Of Dallas/Dfw Airport DivisionAug 26, 2026Dfw - tc terminal c - south skylink exterior escalator and canopy — additions to existing building — reconfiguration of existing space to accommodate new tenants. total scope includes storage. total area: approximately 2,206 sq ft
- 2330 N International Parkway, Dfw Airport Terminal A, Space: A-2-040j-A01 · Dfw AirportApr 29, 2026Gate escape dfw — new construction — tenant fit-out of new concessions space within terminal a of dfw airport
- 2330 N International Parkway · Dallas City OfApr 1, 2024Dfw ctae - package 5 - north sort pier addition — renovation/alteration — the scope of this work includes the construction of two canopies to cover two baggage handling conveyor belts
- 2330 North International Parkway Terminal A Gate 21 · Dfw International AirportJul 30, 2025Auntie anne's pretzels — renovation/alteration — new finishes, new millwork, new equipment
- 2330 North International Parkway Terminal B Gate 22 B-2-069c-A01 · Dfw International Airport Terminal BMay 13, 2025Tgif on the fly — renovation/alteration — concessions tenant improvements including partition wall, electrical and data outlets, millwork installation
- 2330 North International Parkway Terminal C C-2-106e-A01 · Dfw International Airport Terminal CNov 20, 2024Ampersand kiosk — renovation/alteration — installation of new prefabricated kiosk with limited millwork addition and attendant electrical and plumbing infrastructure
- 2330 North International Parkway · Dfw AirportApr 28, 2025Dfw high c restroom fixture replacement — renovation/alteration — replace existing lavatory fixtures in public restrooms with new fixtures. (190sf)
- 2330 N International Pkwy · City Of Dallas/Dfw Airport DivisionNov 20, 2025Dfw - tc ph. 2.1/2.2 enabling package - dfw custodial & shared break room — renovation/alteration — reconfiguration of existing space to accommodate new tenants. total scope includes storage and an office. total area: approximately 1,090 sq ft
- 2333 S. International Pkwy, Terminal D · Dfw Airport - Terminal DOct 30, 2024One-stop security: aa breakroom — renovation/alteration — renovation of storage room into a breakroom space for employees only. (1,250 s.f. total) · 360 m away
- 2333 S. International Pkwy. Space D-Nv114Jun 10, 2025Inmotion — renovation/alteration — interior build-out of existing mercantile concession space (668 sq ft) at dfw terminal d on level 3 to a new mercantile concession space within the same footprint · 360 m away
- 2333 S. International Pkwy, Space Number D-Sc103Jun 10, 2025Dude, sweet chocolate — renovation/alteration — interior build-out of existing mercantile concession space (337 sq ft) at dfw terminal d on level 3 to a new mercantile concession space within the same footprint · 360 m away
- 2333 South International Parkway Dfw Airport 75261 · Dfw AirportFeb 18, 2025Dfw airport terminal d - chili's — renovation/alteration — existing shell space finish-out for new concessions venue at airport terminal. the total square footage is 5434 · 360 m away